Loading...
Coppell Heights 9-CS090908MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, P.E., Dir. of Engineering /Public Works Mike Garza, E.I.T. Glenn Hollowell, Asst. Dir. of Public Works Lee Stone, Commercial Bldg. Inspector Tim Oates, Deputy Chief/Prevention From: Larry Davis, Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 - Date: September 2, 20 /~~~~~;~~{,~. ~,~~~~~~ `~_ _ RE: WALK-THRU INSPECTI for Coppe elg s~Zot ~ B & C 920 S. Belt Line Rd. A final walk-thru for paving and utilities on the referenced project has been scheduled for: Tuesday, September 8, 2009 at 1:30 p.m. Please let me know if I can be of further assistance. ~~yZ~'~ cc: Mohammed Kamal, MJR Engineering (fax #972-767-3003) Calvert Engineering (fax #972-242-9252) "CITY OF COPPELL ENGINEERING -EXCELLENCE BY DESIGN"