Loading...
SW0801-CS090813(9/8/2009) DiWanna Baskins - RE: Denton Tap Sidewalk Project From: "Greg Yancey" <gregyancey@verizon.net> To: "'DiWanna Baskins"' <dbaskins@ci.coppell.tx.us> Date: 8/13/2009 4:34 PM Subject: RE: Denton Tap Sidewalk Project Attachments: FBC Coppell Sidewalk Plan 081309.jpg Hi: It looks like the plan works fine except the north portion. As shown, the walk is immediately adjacent to the new planter. What is the anticipated final elevation of the walk? If it is supposed to match the curb elevation, I think we may still have a problem. Thanks, Gregory K. Yancey Provident Company (214) 215-9400 v (214) 276-1709 f gregyancey@ve rizo n .net -----Original Message----- From: DiWanna Baskins [mailto:dbaskins@ci.coppell.tx.us] Sent: Monday, August 10, 2009 9:36 AM To: Greg Yancey Subject: RE: Denton Tap Sidewalk Project Hi Greg! We have relocated the sidewalk further towards the curb to accommodate all aspects. I have also attached a revised easement document that will better reflect your concerns. Let me know yourthoughts on this. Sincerely, DiWanna »> "Greg Yancey" <gregyancey@verizon.net> 7124/200912:39 PM »> Hi DiWanna: I took your latest plan to the site today and I can't get the same answer as the drawing shows. The attached photos show where 10'6" actually lands back of curb. As you can see, the walk lands against the landscaping we just installed. The existing church walk at 590 is only 9'8" back of curb. I understand why the City wants to move pedestrians safely away from traffic and appreciate the offer to install the walk. We just need to get a better understanding of how this can be achieved without a drastic grade change at the edge of our new planters or a drainage problem. Page 1 I understand TDLR cross slope issues that create challenges for the designer (9/8/2009) DiWanna Baskins - RE: Denton Tap Sidewalk Project and contractor, so I'm unclear as to how this is going to work with the planter. We just finished the planter renovation three months ago. Could you please take another look at this for us? Thanks, Gregory K. Yancey Provident Company (214) 215-9400 v (214) 276-1709 f g regya n cey@ve rizo n .net -----Original Message----- From: DiWanna Baskins [mailto:dbaskins@ci.coppell.tx.us] Sent: Wednesday, July 22, 2009 4:22 PM To: gregyancey@verizon.net Subject: Denton Tap Sidewalk Project Hello Greg, I have attached two pelf's showing the sidewalk location. The first drawing is the drawing that we send to the contractor. The second drawing shows a closer view of the placement of the sidewalk, shown hatched. The sidewalk will look exactly like the sidewalk that is adjacent to this property. (590 Denton Tap) Sincerely, DiWanna Baskins Graduate Engineer Engineering Department (P)972-304-3562 (F)972-304-3570 NOD32 4267 (20090722) Information This message was checked by NOD32 antivirus system. http:l/www.eset.com NOD32 4323 (20090810) Information Page 2 This message was checked by NOD32 antivirus system. http:l/www.eset.com