Loading...
ST0501-CS090819(9/8/2009) DiWanna Baskins - RE: Deforest Road Update -Estates of Cambridge Manor HOA From: "Robinson, Douglas 0." <dorobins@Willscot.com> To: "DiWanna Baskins" <dbaskins@ci.coppell.tx.us> Date: 8119/200912:11 PM Subject: RE: Deforest Road Update -Estates of Cambridge Manor HOA Diwanna, We would like to provide another update to our HOA members Would you please let me know the current status for Deforest design and construction date. Below is the prior update for the Deforest construction as presented in early July. Thank you in advance, Doug Douglas Robinson CSR Project Manager Williams Scotsman, Inc. 4590 Carey Road Fort Worth, TX 76119 817-457-5300 Ext.45401 -Tel. 817-457-5304 -Direct Fax -----Original Message----- From: DiWanna Baskins [mailto:dbaskins@ci.coppell.tx.us] Sent: Wednesday, July 08, 200911:36 AM To: Robinson, Douglas 0. Subject: Re: Deforest Road Update -Estates of Cambridge Manor HOA Hello Doug, I am happy to provide you with updates. Unfortunately, there is not much to report at this time. We are pretty much at a stand still until we resolve the drainage/storm water utility design. We are currently reviewing the 65% submital. There will not be any changes to plans pertaining to sidewalk, tree removal, etc; items included is in the 65% plans. The new estimate for start of construction is 2010, 2nd quarter. The traffic signal will be installed as part of the Deforest project. Installation of traffic signals is usually during the latter portion of the project, shortly after paving. The main item is to ensure that the drainage is designed to a high standard and functions effectively. Until next time, take care! Sincerely, DiWanna Baskins Graduate Engineer Engineering Department (P)972-304-3562 (F)972-304-3570 Page 1 (9/8/2009) DiWanna Baskins - RE: Deforest Road Update -Estates of Cambridge Manor HOA »> "Robinson, Douglas 0." <dorobins@Willscot.com> 7/71200912:27 PM »> Diwanna Baskins, You have been helpful in providing me regular updates on the Plans and Scheduling for the planned Deforest Road Construction. Would you please provide an update that I may share with our homeowners. What is the current project status - -are the plans still out for review? -are there any anticipated changes to the 319/09 65% plans (sidewalks both sides)? -what is the new time estimate to begin utility moves? -what is the new estimate for start of construction and traffic flow changes? -will the Deforest / Macarthur traffic signal be installed separate from the Deforest construction? If so, when? If you have specific dates, great. If not, month or "4th quarter'09" will suffice. Thanks for your assistance. Doug Douglas Robinson CSR Project Manager Williams Scotsman, Inc. 4590 Carey Road Fort Worth, TX 76119 817-457-5300 Ext.45401 -Tel. 817-457-5304 -Direct Fax Page 2