Loading...
SS9402-CS 970612The C'ty ' ' P.O. Box 478 Coppell, Texas 75019 214-462-0022 June 12, 1997 William R. Hindman, P.E. Senior Vice-President HDR 12700 Hilicrest Road, Suite 125 Dallas, TX 75230-2096 Re: Grapevine Creek Center SIR Project SS94-02 Dear Mr. Hindman: Enclosed with this letter please find marked up plans showing changes during the construction of the referenced sewer line. These plans are being provided in response to your March 11, 1997 letter requesting these drawings so you can repair the "as recorded" drawings. Please use these documents in preparing your as recorded drawings and return the as recorded drawings per the contract to the City along with these marked up copies. Your March 11, 1997 letter also discussed the design related to the Northlake Nursery. As of this date, the City has still not been provided with a design that will work. Your first two designs did not accomplish the goal of rerouting the sewer line off the Northlake Nursery. As I requested in my August 26, 1996 letter, prior to authorizing HDR to proceed with yet another design, the City would like an idea of what the cost would be on the third design and how much HDR would then contribute to the additional work, over and above what was bid in the project. I know that HDR has previously committed $5,709 to the alternate construction. However, that number may need to be discussed based on the financial cost of a third design. Once you have considered this information, please feel free to contact me at (972) 304-3679 to further discuss this matter. Sincerely, v~~ n, P.E. Director of Engineering and Public Works Enclosure hdrltr.697