Loading...
Metrocrest Church-CS090909 (2)T~ E c tl T v®~ COPPELL ~ ~~ // T ~ vy/ ~ _ v O .Y A ~ ~ 8 September 9, 2009 Robert VV. Schneeberg, P.E. Gonzalez &Schneeberg Engineers & Surveyors, Inc. 660 North Central Expressway, Suite 250 Plano, 'TX 75074 RE: Metrocrest Church at Riverview Plan Review Cumrnents "I'he City of Coppell has reviewed the referenced plans and has the following comments to offer: Erosion Control Plan 1. Provide permanent erosion control for Swale on the east side of the property Paving Plan 2. Refer to the City of Coppell details(2130 and 2140) for the median nose and left turn lane. 3. The left turn lane will be lime stabilized. (Standard detail 2025) 4. The lire lane should be lime stabilized, if you would like a variance, submit a letter along with the geotechnical report supporting an alternative method. We typically allow an inch thicker with 4000 psi concrete on compacted sub-grade. In this case you show 7" paving which would be acceptable. Cradin~ and Drainage Plan ti. All lines shall be RCP. 6. Provide permanent erosion control for Swale, (sod, hydromulch, etc.) Water and Waste Water Plan 7. Tie in points where street is cut will need plates bolted down. 8. A site specific traffic control plan wiil need to be provided Isom the contractor 48 hours prior to closing any lanes. 9. Add valves on either side of the fire hydrants. Miscellaneous 10. Easements will need to be revised on the plat. 11. Remove all the standard detail pages Crum the plan set. Refer to the City of Coppell standard details. The contractor must have a copy of the standard details onsite at all times. 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 2 There may be additional comments written on the plans that need to be addressed. The plans will be approved once these changes have been made. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations.. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell along with a copy of the City's standard construction details. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of--way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office with the Construction Development Permit Application and a copy of the Construction Site Notice. For your convenience, Page 3 of the permit application is a spreadsheet for use in calculating the inspection fees. A copy of the contract(s) should be attached for verification purposes. If you have any questions, please contact me at your convenience. Sincerely, Michae arza, E.LT. Graduate Engineer Office Phone: (972) 304-3679 Fax: (972) 304-3570 mt~arz~ci.coppel I_tY_us