Loading...
ST9902-CS090507(9/1412009) Ken Griffin - RE: Sandy Lake Trail Issues From: "Matt Atkins" <matkins@tnp-online.com> To: "Keith Marvin" <kmarvin@ci.coppell.tx.us> CC: "John Elias" <JELIAS@ci.coppell.tx.us>, "Ken Griffin" <KGRIFFIN@ci.coppe... Date: 5/7/2009 3:30 PM Subject: RE: Sandy Lake Trail Issues Keith, I talked to TxDOT regarding calling the trail a sidewalk and they said that would not work. Basically, we are stuck with these options. We proceed with the final submittal to TxDOT, that they have requested, telling them we will either modify the trail width to 10' in the design plans or request a waiver. If we change anything at all on the schematic at this point, it will require re-approval of the schematic and set us back a few months. To request the waiver, it will require several submittals, including exhibits & sections, along with all the approvals. The impacts of widening the trail to 10' are minimal. There will be no impacts to the ROW nor to the bridge. The height of the retaining wall may need to be adjusted, but I think we were pretty conservative on that at this point. At most, it would increase in height no more than 1'. The additional cost of the trail and wall height would be less than $20K. Please let me know how you would like to proceed and we will get the ball rolling. Thanks and have a great day! Matt Atkins, P.E. Project Manager 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 214.461.9867 office 214.461.9864 fax matkins@tnp-online.com www.tnp-online.com -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Friday, May 01, 200910:57 AM To: Matt Atkins Cc: John Elias; Ken Griffin; Mark Holliday Subject: Re: Sandy Lake Trail Issues Before we make that decision, can you tell me if adding 2 feet to the trail has any implications on height of retaining walls, width of bridge, amount of ROW necessary, etc... How much money are we talking about for this extra width? Can we simply label the 8'trail as sidewalk? This AASHTO Bike Trail Design seems excessive... Page Keith (9/1412009) Ken Griffin - RE: Sandy Lake Trail Issues Keith Marvin, P.E. Project Engineer (972) 304-3681 »> "Matt Atkins" <matkins@tnp-online.com> 5/11200910:45 AM »> Keith, Ali just called me back regarding the trail and indicated that he told me wrong about removing the trail. Since the schematic has been approved, we have to go with either a 10' trail or a design waiver. I assume you will want to go with a 10'trail and not go through the waiver "painful" waiver process. Please let me know and we will get it submitted. Also, regarding Sandy Lake, did you decide to go with our proposal for ROW services? If so, when would you like us to start? Matt Atkins, P.E. Project Manager 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 214.461.9867 office 214.461.9864 fax matkins@tnp-online.com <mailto:matkins@tnp-online.com> Page 2 www.tnp-online.com <http:l/www.tnp-online.com/>