ST0501-CS081201(9/2112009) Divvanna Baskins - RE: DeForest
From: "Dan DeGroot" <ddegroot@gswwengineers.com>
To: "DiWanna Baskins" <dbaskins@ci.coppell.tx.us>
Date: 1211 /2008 9:26 AM
Subject: RE: DeForest
Sorry that I haven't gotten back to you on this. I don't think we will
be able to put a sidewalk along the southside from Allen Road to the
end. Just past the area in question, we will need to provide drainage
in the ditch. The road is pretty high in this area which inturn
prevents us from putting in a sidewalk and also providing for drainage
at the same time. We can do something to fix the area in question
though. I had broughtthis to everyones attention atour last meeting
and Ken had said to make sure and fix this area. It might take a little
alley pavement replacement, but should be easily fixed.
-----Original Message-----
From: DiWanna Baskins [mailto:dbaskins@ci.coppell.tx.us]
Sent: Monday, November 24, 2008 4:35 PM
To: Dan DeGroot
Subject: Re: DeForest
900 Brentwood Dr.
Page 1
»> "Dan DeGroot" <ddegroot@gswwengineers.com> 11/24/2008 8:28 AM »>
What is the address that the gentle is at?