Loading...
ST0501-CS081201(9/2112009) Divvanna Baskins - RE: DeForest From: "Dan DeGroot" <ddegroot@gswwengineers.com> To: "DiWanna Baskins" <dbaskins@ci.coppell.tx.us> Date: 1211 /2008 9:26 AM Subject: RE: DeForest Sorry that I haven't gotten back to you on this. I don't think we will be able to put a sidewalk along the southside from Allen Road to the end. Just past the area in question, we will need to provide drainage in the ditch. The road is pretty high in this area which inturn prevents us from putting in a sidewalk and also providing for drainage at the same time. We can do something to fix the area in question though. I had broughtthis to everyones attention atour last meeting and Ken had said to make sure and fix this area. It might take a little alley pavement replacement, but should be easily fixed. -----Original Message----- From: DiWanna Baskins [mailto:dbaskins@ci.coppell.tx.us] Sent: Monday, November 24, 2008 4:35 PM To: Dan DeGroot Subject: Re: DeForest 900 Brentwood Dr. Page 1 »> "Dan DeGroot" <ddegroot@gswwengineers.com> 11/24/2008 8:28 AM »> What is the address that the gentle is at?