SS9402-CS 950906 2~4 $~0 447~
SEP 0~ '95 1~?.:41PH HDR .,~R DEPT 37 (~14)960-4471 ~
Fax Sheet
P.1/3
[-DR
Date 09-06-95
Number of Pages (includes cover page)
I Name Mike Martin
[ Telecopy number called 214-304-3673
[Firm Engineering
I City Coppell [State TX
If you do not receive all the pages, please call 214-960-4400 as soon as possible.
From
Name .loc Ezzcll I Department 037
I Telephone 214-900-44t6 [ Job Number 08015-001-037
Regarding Pate Brothers Construction references, ! have attached out tabulation of reference
responses. If you or Ken have any questions, do not hesitate to give me a call.
HDR Engineering, Inc.
12700 Hillcrest Road Telephone
Suite #125 214-960-4400
Dallas, Texas Fax
75230-2096 214-960-4471
Pate Brothers gonslruclion, Inc.
Name City'~l'Graad "City ofLewisville I Trinity River Centex C'ityofWichit'~ City
el'Reference Prakie Jerry Robe~s Authority of Texas S~ve Stolte Nails Je~ry Cosgrove
Roland Barlon (214) 219-3400 Thomas Sanders (gl'/) 467-5711 Ierry C-mss (817) 383-7191
(2J4) 237-8000 (817) 467-4343 _(817) 761-7611
Name 1. Misc. waler line !. SW Old Town Matshatl Creek 3 std~dMsions in t. NoAh Drainage Teasley Lane State
of Project 2. Trinily Blvd. Sewer inteeceptor System the last 6 mon&hs Basin Sewex Phase I-Iighway
2. Lake Park Sewer II
2. East MPP_.C
Role in Project Owner Rep. Owner, Chief Owner ~)eveloper Owner, Utilities O',T~er
I~spector Manab'er
Type Ulitities Sewer lines Sewer line Subdivisions Wale. r & sewer linc Relocation of
of Project ~vater, sower &
dect~ieal lines
Size ($) 1. $500,000 t. $887,000 $500,000 !. $'95,000 1. $1,138,815 $ i,7(10,000
2. ?(IT'water a~,,.arded, partol' (30" line) 2. $403,000 2. $249,315
line & 8" sewer job canceled 3. $120,000
line) 2. $443,0Q0 bid
(439,000 closing)
Duration 1.6/n'onths I. 300 days (1995) 6 months - 1. 15 days 1. Mamh -Nov 94 3 months- summer
of ?rojec! 2. ? shut down in 2. 240 clays completed in 3 2.45 days 2. lane-Sept 94 1993
lhe middle -owner (Oct. !'7, 1994) months 3.2.5 weeks
ran out o[' money-
reda_fred
Dale Completed !. 2 years ago 1. ~40 ~lays Sept. !, 199'5 1. 10 days 1. completed ahead completed oa time
2.3-4. years ago 2. 133 days 2. wiflfin 45 days of schedule
3.4 days inlo 2. completed ahead
proje¢l of schedele
Project Manager Doug Bisballe Doug Bisballe__ Doug Bisballe Doug Bisballe
Job Superintendent D~-~"'~isball¢ Dong Bisballe Golden ? Bruce Shear
Was lob Yes Yes Yes Yes Y~ Yes
Corapleted On
Schedute?
Was Work Done Y~:'~- Yes Yes Yes Y~ Yes
ia a Quality
Were Field Yes Yes Yes Yes Yes Yes
Personnel
Was Conlrac~or Yes, no pro~lems Yes Yes Yes Yes Yes
O3
i-1-i
"O
9/6/95
SEP 06 '95 O~:4~PM HDR EH~R DEPT ~? (~14)960-4471
P.3×3
d