Loading...
SW0801-CS090630(9/2512009) DiWanna Baskins - Denton Tap Sidewalk Project From: DiWanna Baskins To: gregyancey@verizon.net Date: 6/30/200910:47 AM Subject: Denton Tap Sidewalk Project Attachments: Denton Tap Sidewalk Project Hello Greg, Instead of 1 foot off the proposed location of the sidewalk for the easement boundary. Is it ok to have the surveyor prepare 2 feet just in case we shift the sidewalk further from the street? I would like to have the sidewalk at least one foot off the back of curb, if possible. This will notaffect any of your landscaping. Sincerely, DiWanna Baskins Graduate Engineer Engineering Department (P)972-304-3562 (F)972-304-3570 Page 1