SW0801-CS090630(9/2512009) DiWanna Baskins - Denton Tap Sidewalk Project
From: DiWanna Baskins
To: gregyancey@verizon.net
Date: 6/30/200910:47 AM
Subject: Denton Tap Sidewalk Project
Attachments: Denton Tap Sidewalk Project
Hello Greg,
Instead of 1 foot off the proposed location of the sidewalk for the easement boundary. Is it ok to have the surveyor
prepare 2 feet just in case we shift the sidewalk further from the street? I would like to have the sidewalk at least one foot
off the back of curb, if possible. This will notaffect any of your landscaping.
Sincerely,
DiWanna Baskins
Graduate Engineer
Engineering Department
(P)972-304-3562
(F)972-304-3570
Page 1