SW0801-CS090709 (2)(9/2812009) DiWanna Baskins - RE: Denton Tap Sidewalk Project
From: DiWanna Baskins
To: Greg Yancey
Date: 7/9/2009 8:02 AM
Subject: RE. Denton Tap Sidewalk Project
Hello Greg,
1. Yes, the City will maintain the sidewalk that we have built. So, that is the entire sidewalk fronting 580 Denton Tap
Road.
2. To make sure I am clear, the property does not become the City's property. We are being granted permission to build
the sidewalk and maintain on the First Baptist Church's property. It's different from acquiring Right-of -Way, in which the
property changes owners and becomes the City's property.
Perpetually is a strong adverb. Replats and redevelopments do occur. If the developers/owners wanted to revamp the
entire property in the future, they would be able to discuss their ideas/options with the planning and engineering
departments. Owners, for instance, may want a more scenic/curving sidewalk. Or owners may expand and acquire
adjacent lots throughout and want to revamp a much larger development.
In short, is as long as the sidewalk remains, the City will be responsible for maintaining it.
Have I answered your questions for complete understanding?
Sincerely,
DiWanna
»> "Greg Yancey" <gregyanceyClverizon.net> 7/9/2009 7:26 AM »>
Our questions are:
1. Is the City agreeing to maintain the entire walk?
2. Does the walk remain City property perpetually?
Thanks,
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyanceyCalverizon,net
-----Original Message-----
From: DiWanna Baskins f mailto:dbaskinsClci.co~pell.tx.us1
Sent: Monday, July 06, 200910:49 AM
To: Greg Yancey
Subject: RE. Denton Tap Sidewalk Project
Hello again Greg!
I have attached the easement documents prepared by the surveyor. You will
notice that we did move the sidewalk back a bit. The landscaped vegetation
you recently put in will not be affected. The boulders' placement may need
to be adjusted.
Thanks again for working with me on this sidewalk project. If you have any
questions or concerns, absolutely let me know.
Sincerely,
DiWanna Baskins
Graduate Engineer
Engineering Department
Page 1
(9/2812009) DiWanna Baskins - RE: Denton Tap Sidewalk Project
(P)972-304-3562
(F)972-304-3570
»> "Greg Yancey" <gregyanceyClverizon.net> 7/1/2009 8:55 AM »>
Correct, put everything in the name of fbc and I'll get it signed for you.
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyanceyCalverizon,net
-----Original Message-----
From: DiWanna Baskins f mailto:dbaskinsClci.co~pell.tx.us1
Sent: Wednesday, July 01, 2009 8:49 AM
To: Greg Yancey
Subject: RE. Denton Tap Sidewalk Project
So, as the property manager, when I send you the easement documents you can
have the property owner(s) or whomever they designate to sign to complete
the easement documents and return to me?
DiWanna Baskins
Graduate Engineer
Engineering Department
(P)972-304-3562
(F)972-304-3570
»> "Greg Yancey" <gregyanceyClverizon.net> 7/1/2009 8:38 AM »>
We manage this property.
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyanceyCalverizon,net
-----Original Message-----
From: DiWanna Baskins f mailto:dbaskinsClci.co~pell.tx.us1
Sent: Wednesday, July 01, 2009 8:18 AM
To: Greg Yancey
Subject: RE. Denton Tap Sidewalk Project
I am a little confused.
Are you the property owner of 580 Denton Tap formerly owned by JMS
Properties?
DiWanna Baskins
Graduate Engineer
Engineering Department
(P)972-304-3562
(F)972-304-3570
»> "Greg Yancey" <gregyanceyClverizon.net> 7/1/2009 5:54 AM »>
I think 2' is great.
Property owner is:
Page 2
First Baptist Church of Coppell
(9/2812009) DiWanna Baskins - RE: Denton Tap Sidewalk Project
590 S Denton Tap Road
Thanks,
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyanceyCalverizon,net
-----Original Message-----
From: DiWanna Baskins f mailto:dbaskinsClci.co~pell.tx.us1
Sent: Tuesday, June 30, 200910:48 AM
To: gregyanceyCalverizon.net
Subject: Denton Tap Sidewalk Project
Hello Greg,
Instead of 1 foot off the proposed location of the sidewalk for the easement
boundary. Is it ok to have the surveyor prepare 2 feet just in case we
shift the sidewalk further from the street? I would like to have the
sidewalk at least one foot off the back of curb, if possible. This will not
affect any of your landscaping.
Sincerely,
DiWanna Baskins
Graduate Engineer
Engineering Department
(P)972-304-3562
(F)972-304-3570
NOD32 4201(20090630) Information
This message was checked by NOD32 antivirus system.
http://www.eset.com
NOD32 4204 (20090701) Information
This message was checked by NOD32 antivirus system.
http://www.eset.com
NOD32 4204 (20090701) Information
Page 3
This message was checked by NOD32 antivirus system.
http://www.eset.com