Loading...
SS9402-CS 950627John Hall, Chairman" , , , ~ .. Pam Reed, Commi~ioner R. B. 'Ralph' Marquez, Commi~ioner Dan Pearson, Executi~ Directog Ex^s R .sou c Co s av^ o Co iss o Protecting Texas by Reducing and Preventing Pollution June 27, 1995 Larry Redden, P.E. HDR Engineering, Inc. 12700 Hillcrest Rd, Suite 125 Dallas, Texas 75230 Re: City of Coppell Sanitary Sewer Line for Grapevine III & IV Bethel Rd TNRCC Permit No.: Unknown WPR Log No.: 065/061 County: Dallas Dear Mr. Redden: We have received the design submittal included with your cover letter dated 6/19/1995. The rules which regulate the design, installation and testing of domestic wastewater projects are found in 30 TAC, Chapter 317, of the TNRCC's rules titled, Design Criteria for Sewerage Systems.. All plans and specifications submitted for TNRCC approval must comply with these rules. Beginning on September 1, 1994, severe budget reductions required the TNRCC to eliminate most reviews of domestic wastewater project plans and specifications. At most, only a cursory review of the proposed project was performed. A technical review to determine conformity with 30 TAC Chapter 317 has not been performed. The proposed project is approved with the following comments and conditions: An engineering report must be prepared and sealed by a Professional Engineer registered in the State of Texas.- This engineering report must include all constants, graphs, equations, and calculations, which are needed to both justify the design and show full compliance wSth Section 317.1(c) of the TNRCC's rules requiring a final engineering report. Copies of this report shall be made available to the TNRCC, upon request. The final version of the project plans and specifications shall include any and all information necessary to show full compliance with the applicable requirements detailed in Chapter 317 of the TNRCC's rules. Copies of the final version of the project plans and specifications shall be made available to the TNRCC, upon request. P.O. Box 13087 · Austin, Tex,~ 78711-3087 · 512/239-1000 print~l on recycled ~per .,uteri ~4)aJ~l ink Larry Redden, P.E. Page 2 AnY test results necessary to show compliance with the testing requirements of Chapter 317 shall be made available to the TNRCC, upon request. The TNRCC still maintains its review authority and may utilize this authority at any time in the future. Ifplans are to undergo review, the TNRCC will notify you upon our receipt of the project. Also, please be aware of Section 317.1(a) (2) (A) of the rules which states, "Approval given by the commission is not intended to relieve the sewerage system owner or the design engineer of any liabilities or responsibilities with respect to the design, construction, or operation of the project." o Within 60 days of the completion of construction, an appointed engineer must notify both the Permitting Section of the TNRCC's Watershed Management Division and the appropriate Region Office of the date of completion. The engineer must also provide written certification that all construction, materials and equipment, and test results were substantially in accordance with the approved plans and specifications, the rules of the TNRCC and any change orders filed with the TNRCC. All notifications, certifications and change orders must include the signed and dated seal of a Professional Engineer registered in the State of Texas. Ail plans and specifications shall conform'with any other waste discharge requirements and waterquality standards established by the TNRCC, as the requirements pertain to a regulated discharge. If you have any questions or if we can be of any further service, please call me at (512) 239-4554. Sincerely, Thomas W. Weber Manager, Permitting Section Wastershed Management Division cc: City of Coppell TNRCC, Region 4 Office