Loading...
Red Hawk-CS040628Keith Marvin RE Thweat Property,- NW Corner of Denton Tap and BethelSchool Road Page 1 From: "Greg Yancey" <gyancey@cox-internet.com> To: "'Keith Marvin"' <kmarvin@ci.coppell.tx.us> Date: 6/28/2004 4:02:26 PM Subject: RE: Thweat Property - NW Corner of Denton Tap and BethelSchool Road Thanks so much for your help, as usual. I'll stop by with the survey and double check the sanitary sewer on Bethel School. Thanks! Greg -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Monday, June 28, 2004 3:32 PM To: gyancey@cox-internet.com Subject: Re: Thweat Property - NW Corner of Denton Tap and BethelSchool Road Greg, Here is what I've found out: 1. The 10' construction easement is shown on the plans for the Denton Tap construction that took place in the late 1980's through Early 1990's. The city never filed those easements at the courthouse, and when the construction was completed, the easements were effectively abandoned. The "City of Coppell Map 1005A-47 and 1005A-48 are simply the plan and profile sheets for this construction. They are not legal documents as far as ownership is concerned. From my records, I don't see that we acquired any additional ROW on the property to the north when they came through. You will be required to construct sidewalk an landscaping along Denton Tap when that portion of the property develops. That may require the dedication of sidewalk and/or utility easements, however no additional ROW will be required. Resolution Number 031296.1 is not related to these easements. This document is actually related to question number 3, and I'll get to in a minute. 2. This is probably related to a sewer line that runs due north, crosses Bethel School Road, then turns west on the north side of the road. There was a 40' temporary construction easement in this vicinity, but is should no longer be in place. I would have to look at the survey to see exactly what it is. 3. The previous resolution actually vacated the assessment for Mr. Thweat's property in exchange for him granting the easements to construct the sewer line referenced in question number 2. You will however be assessed roadway impact fees in accordance with our impact fee ordinance. Feel free to call with any other questions ~: - __ Keith Marvin - RE: Thweat Property - NW Corner of Denton Tap and BethelSchool Road Page 2 Keith R. Marvin, P.E. City of Coppell (972) 304-7044 kmarvin@ci.coppell.tx. us »> "Greg Yancey" <gyancey@cox-internet.com> 6/28/2004 2:22:24 PM »> Hi Keith: Here are the issues raised with the survey we're using for closing on this property: 1. Although not appearing in the deed, the survey shows a note along all of Denton Tap "10' Construction Easement as shown on City of Coppell Map 1005A-047 & 1005A-048. May be in connection with Coppell Resolution No. 031296.1" I need to determine what this is, especially since the surveyor thought the City claimed this 10' when Wynnepage was re-platted to the north of the subject property. Can you resolve what this is? Perhaps it's only your easement from the Denton Tap improvements and would go away when we re-plat anyway? If you want to formally file the easement, will we be paid? 2. Along Bethel School Road, an odd R.O.W. easement shows up. It starts about 300' from Denton Tap and runs west to the creek. Do you think this goes away at re-plat? 3. Finally, will we be assessed the Denton Tap improvements when we re-plat? (I'm betting Mr. Thweatt didn't pay one dime!) Thanks for your help, Gregory K. Yancey _-n-. -- ~ ~,, ~,~, _ ,,.. ~ Keith Marvin - RE. Thweat Property NW Corner of Denton Tap and BethelSchool Road Page. 3 Provident Company, Inc. (214) 215-9400 v (903) 881-8594 f gyancey@cox-internet.com