October 6, ?009
L Lynn Kadleck, P.C.
Kadleck & Associates
555 Republic Dr. Suite 115
Plano, TX 75074
RE: Red Hawk
Plan Review Comments
The City of Coppell has reviewed the referenced plans and has the following comments
to offer:
Plat
1. Make sure there are visibility triangles at the entrance to the subdivision and the
intersection of Bethel School and Denton Tap Rd.
2. Is the 100 yr flood line shown as the ultimate? If it is not the 100 yr existing then
it should not be shown on the plat because we will then have to enforce the flood
plain ordinance. A drainage easement will be needed on the back side of the wall
for the 100 yr conveyance.
3. Provide 10'X10' corner clips for ADA ramps.
4. Sidewalk should be constructed along Bethel School, Denton Tap Rd. and
Common area 1X. The sidewalk along common area 1X should either be in an
easement or responsibility of the HOA.
Grading Plan
5. Provide an engineered plan for the retaining walls.
Paving Plan
6. Place the sidewalk along Bethel School Road on the street side of the screening
wall.
7. Show the typical section on each sheet.
8. Show the profile for Blackburn Dr.
9. Check the spacing for driveway access on lot 3 of Devon Dr. with the 10' inlet.
10. Check the spacing for driveway access on Washington Ct. with the 10' inlet.
11. Sidewalk should be built on Common Area Lot 1X. The sidewalk along Denton
Tap should be built in the city right of way, if it crosses over onto private property
we will need a sidewalk easement.
12. Why is the typical section half lay-down and half standard curb?
13. Show the sawcut, remove and replace of driveways along Denton Tap Rd on the
paving plans.
255 PARKWAY * P.O.BOX 9478 * COPPE LL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
2
12. Sidewalk should be built on Common Area Lot 1 X. The sidewalk along Denton
Tap should be built in the city right of way, if it crosses over onto private property
we will need a sidewalk easement.
13. Why is the typical section half lay-down and half standard curb?
14. Show the saw-cut, remove and replace of driveways along Denton Tap Rd on the
paving plans.
15. The concrete emergency driveway access to the commercial property Lot 27
Block A. should be installed at this time as directed by the Fire Marshal.
Drainage Plan
16. Proposed inlets should not block driveways to lots.
17. We believe inlet 12 will not be efficient in the location shown.
18. Stop the rock rip rap on the east side of the concrete pilot channel. Show the
profile of the concrete pilot channel and west of it.
Water and Waste Water Plan
19. The water connection should be done by dry bore.
20. Make the tie in of the sewer line more legible; review the plans for the sewer on
Bethel School Rd. Plans SS94-02.
21. You may have some bends on the sanitary sewer line along Devon Dr. to
eliminate some manholes. Minimum radius of 350'.
22. Move the manhole at station 7+66.39 to 9+66.39.
23. See the comments in red regarding the fire hydrants per the fire marshal.
Details
24. Provide a detail for the lay-down curb.
25. Show the crown height for the typical section.
There may be additional comments written on the plans that need to be addressed. Once
the necessary corrections have been made, please return this marked-up set and two
sets of revised plans to the City for review. If you have any questions or need any
additional information, please contact the Engineering Department at your convenience.
Sincerely,
~ ,
Michael Garz
a, E.I.T
Graduate Engineer
Office Phone: (972) 304-3679
Fay: (972) 304-3570