WA9402A-EM000217• ~ • Estimate No. 3 and Final Project: Dallas Water Supply Line No. 3, Section 3A-2 Contractor: Mora Construction, Inc Address: PO Box 154897 Irving, Texas 75015 Contract Time: 45 Working Days Time Used: 22 Working Days Time Remaining: 23 Working Days Estimate Period: 2-1-00 Thru 2-17-00 Work Order Date: PO Number: P0038985,P0038987 (Testing) Account Number: 5411-3206-75901-999146 Contract Amount: $ 389,793.00 Testing Amount: $ 7,197.00 Payable this Estimate: $ 25,664.65 Contract Amount Remaining: $ - Percent Expended: 100.0% File name: Dallas Water Supply Line No. 3,Section 3A, Phase 2 Item Item Contract Previous This Total Unit No Description Quantity Unit Estimate Estimate Quantity Price Amount 1 60" RCCP (Class200) E-301 by Open Cut 1180 LF 1180.00 1180.00 $ 259.00 $ 305,620.00 2 12-inch Blow Off Valve with 5' Manhole 1 EA 1.00 1.00 $ 6,200.00 $ 6,200.00 3 Wet Connection incl 60-inch Closure Piece 1 EA 1.00 1.00 $ 21,500.00 $ 21,500.00 4 60" Plug 1 LS 1.00 1.00 $ 6,800.00 $ 6,800.00 5 Rem & Salvage Exist 60" Plug 1 LS 1.00 1.00 $ 2,500.00 $ 2,500.00 6 Furn and Install Steel Mesh Fence 1072 LF 1170.00 -98.00 1072.00 $ 5.00 $ 5,360.00 7 Rem & Repl Exist Barbed Wire Fence 149 LF 149.00 149.00 $ 7.00 $ 1,043.00 8 Rem & Repl Exist Chain Link Fence 280 LF 280.00 280.00 $ 21.00 $ 5,880.00 9 Furn and Inst Extra 2000 PSI Conc for Embed 20 CY 20.00 20.00 $ 110.00 $ 2,200.00 10 Des and Implement Strm Wtr Poll Prev Plan 1 LS 1.00 1.00 $ 7,500.00 $ 7,500.00 11 Des and Provide Trench Safety Systems 1180 LF 1180.00 1180.00 $ 15.00 $ 17,700.00 12 Furn and Install Project Sign 1 EA 1.00 1.00 $ 500.00 $ 500.00 0.00 $ - Change Order #1 0.00 $ - 6A Furn and Install Steel Mesh Fence 98 LF 98.00 98.00 $ 5.00 $ 490.00 13A Removal of Conc Beams in path of 60" Water Main 1 LS 1.00 1.00 $ 6,500.00 $ 6,500.00 Total Estimate: $ 389,793.00 Engineering Inspections Supervisor \~ Less Previous Payments: $ 364,128.35 Amount payable this Estimate: $ 25,664.65 Jack Angel, Director of Pul1~c Works Date Workman's Comp Expire General Liability Expires: F na mate: Contractor CITY OF IRVING PUBLIC WORKS DEPARTMENT • ENGINEERING DIVISION P.O. Boy. 152288, IRVING, TX 75015-2288 • 825 W. IRVING BLVD, IRVING, TX 75060 972.721.2611 • FAX 972.721.2592 L.S. • • Trench safety system ~~ g. i OWNER'S ALLOWANCE for Each SCADA System /o: rz~ $800,000 TOTAL BASE BID PRICE (BID SCHEDULE ITEMS 1 THROUGH 9) $800,000 For the lump sum of $ ~ ~~ / (P ice in Fi ores) .~.~.~ ic.~ ~- ~~~{u~t. iuiti~ ~~"~rrE. ~- i 1t~ '~~ 7 J"! (Price in Words) X ~7~"JS ~1'~~'~/ ?~i~ Item Approx. Unit Price Total Price No. Quantity Description of Items (Figures) (Figures) B1D ALTERNATIVES (BA) BA1 1 Construct the meter vault at ~ G~~ ~~~ the Elm Fork Water Treatment Plant, including piping, valves, and all other related work (Area 7). BA2 1,000 c~ Imported Class 2 trench _ c~0 ot~ 01~, 00C~ Cu. Yd backfill, complete, including _ transportation, handling, placement and compaction BA3 2,000 ao Imported backfill, complete ~U c~ ~4, 0~~ Cu. Yd including transportation, handling, placement and compaction BA4 750 Reinforced 6" concrete lining, ~~~ ~O~ d(~0~ Sq. Yd complete, including transportation, handling, and placement BA5 1,000 ' Qp Gravel road per detail C-132, !O acs ~O QC~(~ Sq. Yd complete, including material ~ transportation, handling, placement and compaction ~ BP-6 (Rev. #2) Todd Reck Wednesday June 25, 2003 8:03 AM Micah Reed „~; SCADA Cost for the Elm Fork Meter Vault Capital Cost for 2 RTUs - $67,414 Installation Cost - $5,537.19 per RTU (need to multiply by 2)