cooper excavation, Inc,
Excavation •iLime Stabilization •.Demolition
X)1X27 Shady Trail, Suite 108
Dallas, Texas 75229
October 3, 2002
Mr. Ryan Roberts
Centex Construction
3100 Mckinnon
Dallas, Texas 75201
Office (972) 243-5455
Metro (972) 988-0200
Fax (972)243-5227
RE: St. Joseph's Village
g~'{ Z, ~~ Z
To reduce Staz Leaf Road from 33' to 28' is~33'sq. yrds less of lime or $~$~5:~6: The
city increased the lime from 27 pounds to 30 pounds at a cost increase of $2,268.00.
If you have any questions please call me at the office.