To: Centex Construction Company Date: 10/04/02
1201 E. Sandy Lake Road
Coppell, TX. 75019
Attn: Ryan Roberts
Phone: 872 471 -1444
Fax 972 471 -1499
Project: St. Joseph Village
TAS 0: 20163
Subject: RCO #05 Request For Change Order
Decrease width of Star Leaf 33' to 28'
TAS Commercial Concrete Construction, L "P. is pleased to submit the following cost proposal
The proposed cost break down is as follows:
Item Equip.
phase No. Description Quantity Un tabor Material Sub Total
2000 1 8" Paving 7,953 sf ($3,921) ($13,368) $0 .,. ( 19,883)
Total ($19,883)
Qualifications: None
Exclusions: None
Please issue a Change Order at your earliest convenience.
Sincerely,
TAS Commorcial Concrete Construction, L.P.
'/'<j 1� .;
Bobby Paret
• Sr. Project Manager
cc: File 20163
Red Flannagan
Jack Clapp
R CO log 10!6102
SENT BY :TAS CONSTRUCTION INC. ;10- 9- 2 ; 7:13AM ; T.A.S. CONSTRUCTION- 9724711499;# 1/ 2
W-CEIVED
CGN1IMMIDNSTRUCTION CO
OCT 0 9 2002
T.A.S. COMMERCIAL CONCRETE CONSTRUCTION, L.P.
4800 CASH ROAD, DALLAS, TE XAS 7524T Phone 214180 Fax 2141905 -9992
Fax Transmittal
To: Centex Construction Company Date: 10/04/02
1201 E. Sandy Lake Road
Coppell, TX. 75019
Attn: Ryan Roberts
Phone: 972 471 -1444
Fax 972 471 -1488
Project: St. Joseph Village
TAS M 20163
Subject: RCO #04 Request For Change Order
Slip Forming of Star Leaf Road
TAS Commercial Concrete Construction, L.P. is pleased to submit the following cost proposal
The proposed cost break down is as follows:
Phase
Item
No.
Description
Quantity
Un
Labor
Equip.
Material
Sub
Total
2000
1
Slip Form from Sta 1 +00 to 18 +50
48043
sf
$0
$0
$29,884
$29,884
2000
2
Delete Form Work for Slip Forming
2310
If
($924)
($2,263)
($3,187)
2000
3
Delete All Pumping of Concrete
1324
cy
($3,972)
($3,972)
2000
4
Delete All Hand Place and Finish
49087
sf
($3,984)
($3,994)
2000
5
Add for Hand Pour &Finish Block outs
2551
sf
$1,582
$1,582
2000
6
Add for 5% additional Yield Concrete
77
cy
$5,141
$15,141
2000
7
Add Gravel for Inlets (in/out)
10
cY
$782
$225
$1,007
Total
$26,471
Qualifications: Subgrade must be +/-.01 per contract. Densities for subgrade must be provided. Five foot each side
of paving is required for access. Per contract slip forming only that portion under contract
see station numbers above. Layout points required.
Mix Designs for slip forming and hand pour are attached for approval. Concrete orders place on each
Monday at 10:00 am for the next week, Written approval and acceptenco is required prior to
releasing work to proceed. Seven working day notice required for scheduling for machine.
Scheduling does not include rain days. No retainage on slip form operation.
From Sta. 4 +19 to Ste. 1+00 slip form width will be 25', Hand pour curb /gutter and balance of
street starting from 18" at Sta. 4 +19 to 4' at Sta. 1 +00 on each side of the road.
Please issue a Change Order at your earliest convenience. Sign and return copy showing your acceptance.
Sincerely,
TAS Commercial Concrete Construction, LIP.
7'1
e A4
Bobby Paret
Sr. Project Manager
cc: File 20163
Red Flannagan
Jack Clapp
Signed:
Centex Construction Co.
Anthony Lauchner
Project Manager
.r
RCO Iog1019102
01AUL IN- 0 U - iU - 4 , 0•001701 f 1 .A. 3. CO lKU(.c
T.A.S. COMMERCIAL CONCRETE CONSTRUCTION, L.P.
4W CASH ROAD, DALLAS, TEXAS 76247 Pho" 7141 905 -9950 fax 2141!054992
Fax Transmittal
To: Centex Construction Company
1201 E. Sandy Lake Road
Coppell, TX. 75019
Attn: Ryan Roberts
Phone: 972 471 - 1444
Fax: 972 471 -1499
Project St. Joseph Village
TAS #: 20163
Subject: RCO #07 Request For Change Order
Delete Sidewalk Down East Slde of Star Leaf Rd.
TAS Commercial Concrete Construction, L.P. is pleased to submit the following cost proposal
The proposed cost break down is as follows:
9724711499;# 3/ 3
Date: 10/10/02
Item Equip.
Phase No. Description Quantity Unit Labor Material Sub Total
2300 1 Sidewalks (9,250.00) sf ($15,725) ($5,088) / ($2 ,8 8113)
Total
Qualifications. Delete sidewalk down east side of Star Leaf rd. from 18 +50 to 0+00.
'/' o
Exclusions: None A/
Please issue a Change Order at your earliest convenience.
Sincerely.
TAS Commercial Concrete Construction, L.P.
6obb t
Y
Sr. Project Manager
cc File 20153
Red Flannagan
Jack Clapp
�..as /5F
$20,a13)
v�o�J ,5
r
ROO log! oft od02