Loading...
SS9901A-PR021004SENT BY :TAS CONSTRUCTION INC. ;10- 8- 2 ; 8 :59AM ; T.A.S. CONSTRUCTION 9724711499;# 1/ 1 CEIVI D7 RECEIVED CONSTRUCTION CO O C T o 8 2ov T.A.S. COMMERCIAL CONCRETE CONSTRUCTION, L.P. 41100 CA R D ALLAS, TEXAS 76 P 214 W64M FaX 21411106-9802 Fax Transmittal To: Centex Construction Company Date: 10/04/02 1201 E. Sandy Lake Road Coppell, TX. 75019 Attn: Ryan Roberts Phone: 872 471 -1444 Fax 972 471 -1499 Project: St. Joseph Village TAS 0: 20163 Subject: RCO #05 Request For Change Order Decrease width of Star Leaf 33' to 28' TAS Commercial Concrete Construction, L "P. is pleased to submit the following cost proposal The proposed cost break down is as follows: Item Equip. phase No. Description Quantity Un tabor Material Sub Total 2000 1 8" Paving 7,953 sf ($3,921) ($13,368) $0 .,. ( 19,883) Total ($19,883) Qualifications: None Exclusions: None Please issue a Change Order at your earliest convenience. Sincerely, TAS Commorcial Concrete Construction, L.P. '/'<j 1� .; Bobby Paret • Sr. Project Manager cc: File 20163 Red Flannagan Jack Clapp R CO log 10!6102 SENT BY :TAS CONSTRUCTION INC. ;10- 9- 2 ; 7:13AM ; T.A.S. CONSTRUCTION- 9724711499;# 1/ 2 W-CEIVED CGN1IMMIDNSTRUCTION CO OCT 0 9 2002 T.A.S. COMMERCIAL CONCRETE CONSTRUCTION, L.P. 4800 CASH ROAD, DALLAS, TE XAS 7524T Phone 214180 Fax 2141905 -9992 Fax Transmittal To: Centex Construction Company Date: 10/04/02 1201 E. Sandy Lake Road Coppell, TX. 75019 Attn: Ryan Roberts Phone: 972 471 -1444 Fax 972 471 -1488 Project: St. Joseph Village TAS M 20163 Subject: RCO #04 Request For Change Order Slip Forming of Star Leaf Road TAS Commercial Concrete Construction, L.P. is pleased to submit the following cost proposal The proposed cost break down is as follows: Phase Item No. Description Quantity Un Labor Equip. Material Sub Total 2000 1 Slip Form from Sta 1 +00 to 18 +50 48043 sf $0 $0 $29,884 $29,884 2000 2 Delete Form Work for Slip Forming 2310 If ($924) ($2,263) ($3,187) 2000 3 Delete All Pumping of Concrete 1324 cy ($3,972) ($3,972) 2000 4 Delete All Hand Place and Finish 49087 sf ($3,984) ($3,994) 2000 5 Add for Hand Pour &Finish Block outs 2551 sf $1,582 $1,582 2000 6 Add for 5% additional Yield Concrete 77 cy $5,141 $15,141 2000 7 Add Gravel for Inlets (in/out) 10 cY $782 $225 $1,007 Total $26,471 Qualifications: Subgrade must be +/-.01 per contract. Densities for subgrade must be provided. Five foot each side of paving is required for access. Per contract slip forming only that portion under contract see station numbers above. Layout points required. Mix Designs for slip forming and hand pour are attached for approval. Concrete orders place on each Monday at 10:00 am for the next week, Written approval and acceptenco is required prior to releasing work to proceed. Seven working day notice required for scheduling for machine. Scheduling does not include rain days. No retainage on slip form operation. From Sta. 4 +19 to Ste. 1+00 slip form width will be 25', Hand pour curb /gutter and balance of street starting from 18" at Sta. 4 +19 to 4' at Sta. 1 +00 on each side of the road. Please issue a Change Order at your earliest convenience. Sign and return copy showing your acceptance. Sincerely, TAS Commercial Concrete Construction, LIP. 7'1 e A4 Bobby Paret Sr. Project Manager cc: File 20163 Red Flannagan Jack Clapp Signed: Centex Construction Co. Anthony Lauchner Project Manager .r RCO Iog1019102 01AUL IN- 0 U - iU - 4 , 0•001701 f 1 .A. 3. CO lKU(.c T.A.S. COMMERCIAL CONCRETE CONSTRUCTION, L.P. 4W CASH ROAD, DALLAS, TEXAS 76247 Pho" 7141 905 -9950 fax 2141!054992 Fax Transmittal To: Centex Construction Company 1201 E. Sandy Lake Road Coppell, TX. 75019 Attn: Ryan Roberts Phone: 972 471 - 1444 Fax: 972 471 -1499 Project St. Joseph Village TAS #: 20163 Subject: RCO #07 Request For Change Order Delete Sidewalk Down East Slde of Star Leaf Rd. TAS Commercial Concrete Construction, L.P. is pleased to submit the following cost proposal The proposed cost break down is as follows: 9724711499;# 3/ 3 Date: 10/10/02 Item Equip. Phase No. Description Quantity Unit Labor Material Sub Total 2300 1 Sidewalks (9,250.00) sf ($15,725) ($5,088) / ($2 ,8 8113) Total Qualifications. Delete sidewalk down east side of Star Leaf rd. from 18 +50 to 0+00. '/' o Exclusions: None A/ Please issue a Change Order at your earliest convenience. Sincerely. TAS Commercial Concrete Construction, L.P. 6obb t Y Sr. Project Manager cc File 20153 Red Flannagan Jack Clapp �..as /5F $20,a13) v�o�J ,5 r ROO log! oft od02