Loading...
SS9402-CS 941212December 12, 1994 Mr. Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer City of Coppell 255 Parkway Boulevard Coppell, Texas, 75019 }OR Re: City of Coppell, Texas Sanitary Sewer Improvements Project No. SS9402 Grapevine Creek III, IV, and Bethel Road A rn endm ent to Contract Dear Mr. Griffin: In accordance with the referenced contract between HDREngineering and the City of Coppell, dated October 25, 1994, we are submitting this request for modification to the contract fee amount. The fee modification is requested due to a change in scope, as provided in Exhibit A - Surveying Services of the Contract. The change in scope is necessary to provide survey information along the west side of Denton Tap Road from the existing sewer crossing of Denton Tap Road, north to the approximate lot line between tracts 3 and 4 of the Butch Addition. An additional survey is also required along the approximate lot line between tracts 3 and 4, west from Denton Tap Road to the existing sewer along Grapevine Creek. We request approval of an increase in the fee amount in paragraph 5.22 of one thousand dollars and no cents ($1,000.00). Please signify your approval of this contract change by signing below and returning one copy. Very truly yours, HDR ENGINEERING, INC. William R. Hindman, P.E. Senior Vice President LGR/pkw CITY OF COPPELL Name: Title: Jim ~itt C~ty Nanager HDR Engineering, Inc. Suite 125 12700 Hillcrest Road Dallas, Texas 75230-2096 Telephone 214 960-4000