Loading...
Yr 3 Annual Report - Coppell & NWDFCDMunicipality/Organization: City of CoppelV Northwest Dallas County Flood Control District TPDES Permit Number: TXR040000 TCEQ NOI Form #: 20368 Annual Report Number & Reporting Period: August 13, 2008 -August 13, 2009 TPDES Phase II Small MS4 General Permit Annual Report (Due: November 12, 2009) Part I. General Information Contact Person: Michael Garza Title: Graduate Telephone #: 972-304-7019 Email: mgarza@ci.coppell.tx.us fling Address: 255 E. Parkway Blvd., Coppell, Tx 75019 Permit No.: STW / TXR040375/ RP Phase II (Small) MS4 Annual Report Form TPDES General Permit No. TXR040000 A. General Information 1. Permit No. TXR040375 Annual Report Period: 8/13/08-8/13/09 Name of MS4 / Permittee: City of Coppell/Northwest Dallas County Flood Control District (NWDCFCD) Contact Name: Michael Garza Telephone Number: 972-304-7019 Mailing Address: 255 E. Parkway Blvd., Coppell, Tx 75019 E-mail Address: mgarza(c~ci.coppell.tx.us 2. Is the named permittee relying on another entity/ies to satisfy some of its permit obligations? X Yes No If Yes, provide the name(s) of other entity/ies and an explanation of their responsibilities (add more spaces or pages if needed): Name and Explanation: Northwest Dallas County Flood Control District (NWDCFCD)- Responsible for complying with MCM #6 within their boundaries of the City of Coppell. Name and Explanation: Name and Explanation: Name and Explanation: Name and Explanation: Page 1 of 18 10/12/09 3. Is the named permittee sharing a SWMP with other entities? X Yes No If "Yes," list all associated permit numbers and permittee names (add additional spaces or pages if needed): Permit Number: TXR 040053 Permit Number: Permit Number: Permit Number: 4. Is this asystem-wide annual report including information for all permittees? Permittee: Northwest Dallas County Flood Control District Permittee: Permittee: Permittee: X Yes No Explanation, if any, the NWDCFCD lies entirely inside the City of Coppell, then are responsible for inspection and maintenance of the district owned facilities and are responsible for MCM #6 for their facilities. 5. Has a copy of this annual report been submitted to the TCEQ Regional Office? X Yes No A. SWMP Modifications and Additional Information. Include a brief explanation if you check "Yes" to any of the following statements. 1. a. Changes have been made or are proposed to the SWMP since the NOI or the last annual report, including changes in response to TCEQ's review. Yes X No b. If Yes to the above, has the TCEQ already approved the original SWMP? Yes No N/A Page 2 of 18 10/12/09 c. If Yes to the above, indicate whether an NOC (or letter) has been submitted to document the changes to the approved SWMP as required by the general permit. (Note that if an NOC is required, it must be submitted to the address shown on the NOC. Do not attach the original NOC form to this report.) Yes No 2. The MS4 has annexed lands since obtaining permit coverage. Yes X No 3. A receiving water body is newly listed as impaired or a TMDL has been established. Yes X No 4. The MS4 has conducted analytical monitoring of storm water quality. Yes X No Explain below or attach a summary to submit along with any monitoring data used to evaluate the success of the SWMP at reducing pollutants to the maximum extent practicable. Be sure to include a discussion of results. Page 3 of 18 10/12/09 C. Narrative Provisions. 1. Provide information on the status of complying with permit conditions: Yes No Explain Permittee is currently in compliance with the SWMP as submitted to and / All burp's have been approved by the TCEQ. accomplished Permittee is currently in compliance with recordkeeping and reporting / All documentation is on file requirements. Permittee meets the eligibility requirements of the permit (e.g., TMDL / Deficient items in checklist requirements, Edwards Aquifer limitations, compliance history, etc.) have been corrected 2. Provide a general assessment of the appropriateness of the selected BMPs: Has the permittee determined that any of the selected BMPs are not appropriate for reducing the discharge of pollutants in storm water? Yes X No Provide explanation: By observation, all burp's appear to be effective and appropriate: No testing of the waterways have been done therefore, no data has been collected for comparison. We have received positive feedback from the public regarding the stormwater education. Municipal employees are more cognizant of pollution prevention practices. Contractors working in the City of Coppell are also cognizant of pollution prevention practices. Page 4 of 18 10/ 12/09 3. Describe progress towards reducing the discharge of pollutants to the maximum extent practicable (MEP). Summarize any information used (such as monitoring data) to evaluate reductions in the discharge of pollutants. Use a narrative description or table as appropriate: MCM BMP Parameter Quantity Units Does BMP Demonstrate a Direct Reduction in Pollutants? (Yes / No /Explain) Or, provide explanation below: No testing of the waterways have been done, therefore, no data has been collected for comparison. We have received positive feedback from the public regardinq the stormwater education. Municipal employees are more cognizant of pollution prevention practices and have altered some of their procedures in order to comply with the permit. Contractors working in the City of Coppell are also cognizant of pollution prevention practices. We have not received complaints regardinq illegal dumping or discharges into the creek. We have received phone calls from residents asking questions regardinq storm water tips and ideas in the water bill inserts. We are looking to get volunteers from residents to begin a sampling program in the next year or two If sampling will be required in the future we would like Page 5 of 18 10/12/09 to have a program in place. 4. Provide a general evaluation of the program's progress, including any obstacles or challenges encountered in implementing BMPs, meeting the program's schedule, etc.: The progress is coming along, the City of Coppell has recently implemented an EMS for our service center which has helped with complyinq with MCM#6 Involving other departments is somewhat a difficult task. Making sure that the other departments have completed their tasks and provide us with the documentation in complying with the SWMP can be a task in itself. 5. Provide the number of construction activities (other than those where the permittee was the operator) that occurred within the regulated area as indicated via notices of intent or site notices: There were 10 construction activities that required a NOI or a construction site notice 6. Does the permittee utilize the 7t" MCM related to construction? If Yes, then provide the following information: a. The number of municipal construction activities authorized under this general permit: b. The total number of acres disturbed for municipal construction projects: Yes X No Though the 7th MCM is optional, this must be requested on the NOI or on a NOC and approved by the TCEQ. 7. Requirements for Specific Minimum Controls Measures (MCMs): a. For MCM 1 -Public Education and Outreach, provide documentation of activities conducted and materials used to fulfill the requirements of this MCM. b. Also for MCM 1, provide documentation of the amount of resources used to address each group (e.g., visitors, businesses, etc.). Page 6 of 18 10/ 12/09 c. For MCM 3 -Illicit Discharge Detection and Elimination (IDDE), indicate whether you have developed a list of allowable non-storm water discharges, other than those already listed in the general permit. If you have developed a list and have made any changes to the local controls, conditions and/or programs being established for discharges, include this information below. If you do not have any changes for this permit year, indicate that this item is not applicable. A & B.) Posted Storm water quality messages in the monthly Utility bill insert - 5 times, Storm water web page on the city's website, Labled storm drains throughout the city-10 inlets. Public education programs: Coppell Community Gardens with Texas SmartScape borders/Compost Education site - 280 volunteers and 220 visitors, Keep Coppell Beautiful board with 42 clean up groups and 1776 volunteers, Denton Creek Clean up with 105 volunteers, Clean Coppell Earthfest with over 200 booths including the City of Coppell storm water booth and distributed 200 doggie dispensors and had 1200 volunteers for Litter Clean up. Water wise tour of the dallas water district which included two municipal sites. Included 3,974 column inches in articles in the Dallas Morning News, Citizen's Advocate, and the Coppell Gazette for information pertaining to public education and outreach. C.) We are currently completing our illicit discharge ordinance and there are additional items that will be included as prohibited discharges other than those already listed in the general permit. The list will be included in year 3 annual report. 8. Describe any proposed changes to the SWMP in the coming reporting year. None at this time. 9. Describe any activities planned for the next permit year /reporting cycle. Continue existing BMP's including revise the storm water website, public education programs, train field staff to detect and eliminate illicit discharges, implement the illicit discharge management ordinance, complete the review of the ISWM manual and adopt the appropriate sections. Develop and implement the pollution prevention plans for Page 7 of 18 10/12/09 municipal operations, implement a training program and develop and implement the inspection and maintenance program. Page 8 of 18 10/12/09 D. Storm Water Management Program Status. Provide the status of every BMP and measurable goal listed in the SWMP, as described in the instructions. Each MCM, but not necessarily each BMP, must include the measurable goals described in the SWMP. For a shared SWMP, include the name of the responsible MS4 operator(s) in the "BMP" column. (Though an MS4 is not required to implement BMPs until the initial SWMP is approved by the TCEQ, the MS4's initial annual report should include a description of what has been done to date, even if the SWMP has not yet been approved. The MS4 will receive credit for all BMPs implemented prior to and during the first permit year if they are described in the initial annual report.) Table 1 -BMP Status MCM(s) BMP Milestones of Permit Year New or Start Status /Completion Date Revised Date com feted, in ro ress, not started 1 Provide public Complete community public revised Prior to Ongoing and continuous to year 3 and education programs education programs (Texas permit will continue throughout permit term. to commercial and Smartscape, Keep Coppell industrial business Beautiful, Denton Creek and the public- Clean up, Clean Coppell Parks and Earthfest, Water Wise Tour, Recreation Organic Gardening class. dept./Community Articles in local newspapers Program Supervisor with 3,974 column inches 1 City Desk Storm Posted storm water tips and April In progress, continue water bill inserts water quality messages in 5 monthly water 2008 in Yr. 3 and will continue throughout messages- bill inserts permit term. Community Information Officer(CIO) 1,2 Municipal Website- Develop a page on the Revised Sep Posted SWMP and annual report on Director of municipal website with storm 2008 city website and City Secretary's office, Engineering water quality information Storm Water website with information and tips. Will revise the website and include links and education in Year 3. Page 9 of 18 10/ 12/09 1 Storm drain Placed 10 storm drain labels revised Prior to In progress, continue labeling storm labeling- Director of on inlets through out the city permit drains in Yr. 3 Engineering 2 Comply with state Post SWMP and annual revised Sep Will continue to leave SWMP and and local public report on city's website and 2008 annual report posted for public review notice City Secretary's office for and comment. No comments received requirements- public review and comment. thus far. Director of Engineering 3 Conduct initial Conducted training for New Oct Will continue to train field staff on training program to municipal employees and 2008 detection and elimination in yr 3. detect and address demonstrated illicit non-storm water discharges at Clean Coppell discharges and Earthfest prohibit any significant pollutants - Director of Engineering 3,4 implement existing Implemented Ordinance Prior to In Progress, ongoing and will continue city ordinances- 92559 (unlawful to litter); permit throughout permit term. Director of Ordinance 95687(unlawful to Engineering allow animals to defecate on private or public property other than the owner of the animal); Ordinance 95698 unlawful to discharge waste on public or private property adjacent to any outlet , watercourse or storm sewer) Page 10 of 18 10/12/09 3 Develop and Developed observation June In progress, continue to teach city staff implement a cards/inspection checklist for 2008 and use observation cards in Yr. 3 and program to detect use by city staff will continue throughout permit term. and eliminate illicit discharges- Director of Engineering 3 Storm Sewer Map- Updated existing GIS storm Prior to In progress, continue to map storm Director of sewer map permit sewer system in Yr. 3 and will continue Engineering throughout permit term. 3 Illicit Discharge Drafted and finalized Illicit Feb Adopt Ordinance and implement in Yr. Ordinance- Director Discharge ordinance 2009 3. of Engineering 4 Implement existing Implemented Ordinance Prior to In progress, ongoing and will continue city ordinances - 91514,(erosion and permit throughout permit term. Director of sedimentation control); Engineering Ordinance 91500-A-203 (Tree preservation requirements) 4,5 DRC review - Reviewed all construction Prior to In progress, ongoing and will continue Director of plans to ensure compliance permit throughout permit term. Engineering with city ordinances 4 Pre-Construction Held meetings for all public Prior to In progress, ongoing and will continue meetings -Director and private projects, to permit throughout permit term. of Engineering explain to the developer and contractor the ordinances that they should be in compliance with. Page 11 of 18 10/ 12/09 4 Site inspections - Implement procedures for July Implemented site inspection and will Director of site inspection 2009 continue through permit term Engineering 3,4 Reporting Hotline - Established procedures for Prior to In progress, ongoing and will continue Director of addressing comments on permit throughout permit term. Engineering CLINK 5 Initiate review of Began review and draft of June In progress, will continue to draft local draft ISWM design local criteria of ISWM for 2009 criteria and will complete the review criteria and adoption and implementation and adopt portions necessary to the standards -Director city in Yr 3. of Engineering 6 Street Sweep and Sweep the major streets and Prior to Completed, continue in Yr. 3 and will roadway clean curb inlets, drains, and permit continue throughout permit term. maintenance - repairs erosion areas based Director of on visual inspections and Engineering citizen complaints. 6 Storm Water Clean concrete drainage Prior to Completed, continue in Yr. 3 and system channels and periodic permit through permit term Maintenance - inspections of inlets and Director of outFalls; periodic removal of Engineering trees from creeks Page 12 of 18 10/12/09 6 Parks and Open Trash removal on Wed. Prior to Ongoing, continue in Yr. 3 and through Space-trash Brush removal schedule on permit permit term removal -Parks and Sat. Recreation dept 6 Parks and Open The parks dept. post Prior to Ongoing, continue in Yr. 3 and through Space-removal of ordinance signs associated permit permit term animal feces from with the removal and proper public parks -Parks disposal of animal feces in all and Recreation dept public parks 6 Wastewater The utilities division cleans Prior to Ongoing, continue in Yr. 3 and through collection -Director and videos sewer lines on an permit permit term of Engineering annual basis 6 Fleet and Building Maintain buildings, Prior to Ongoing, continue in Yr. 3 and through Maintenance - permanent structures, permit permit term Director of parking lots and storage Engineering yards 6 Fleet and Building Maintain city service center; Prior to Ongoing, continue in Yr. 3 and through Maintenance - proper disposal of waste in permit permit term Director of service bays Engineering 6 Parks and Open Parks dept. uses native and Prior to Ongoing, continue in Yr. 3 and through space- native adapted vegetation to reduce permit permit term vegetation -Parks water, fertilizer and pesticide and Recreation dept needs 6 Structural control Developed inspection June Ongoing, continue in Yr. 3 and through maintenance - checklist for municipal 2009 permit term Director of operations Engineering Page 13 of 18 10/12/09 6 Parks and Open space-pesticide limitation -Parks and Recreation dept Uses integrated pest management to limit the amount of pesticides used Prior to permit Ongoing, continue in Yr. 3 and through permit term 6 Program to reduce Implemented a training Oct Ongoing, continue in Yr. 3 and through or eliminate polluted program for municipal 2008 permit term runoff from employees municipal operations - Director of Engineering 6 Maintain district Review structures of the Prior to Ongoing, continue in Yr. 3 and through facilities and repair district facilities and repair permit permit term as needed - and maintain as needed. Northwest Dallas County Flood Control District Page 14 of 18 10/12/09 Table 2 -Measurable Goals Status MCM(s) Measurable Goal(s) Success Groups Reached Proposed Changes (submit NOC as needed 1 Post 2 stormwater quality messages in water bill Exceeded goal, posted messages in 5 Residents, businesses, None insert water bill inserts, exceeded goal, 1 Label Storm drains with a business Residents Public message"drain for rain, Labeled 10 storm drain inlets, met goal , , , visitors None flows to creek" 1,2 Completed 7 public education programs, Public, Residents, business, commercial and industrial visitors Public education programs had many people volunteer throughout the , facilities, public service None community and participate in the employees, construction site programs, met goal ersonnel 1,2 Public, Residents, business, Post SWMP on city visitors, commercial and industrial Website and keep updated Posted SWMP on website, facilities, public service None employees, construction site personnel 2 Comply with state and local public notice Met goal, none have been required N/A None requirements 2 Posted the annual report on the website, Public, Residents, business, Post annual report on did not track how many people visited the visitors, commercial and industrial None website site, we will update website and track facilities, public service visitors in Yr. 3 emplo ees, construction site Page 15 of 18 10/12/09 personnel MCM(s) Measurable Goal(s) Success Groups Reached Proposed Changes (submit NOC as needed) 3,4 Public, Residents, business, None Finalize Illicit discharge Completed ordinance, will take to council visitors, commercial and industrial facilities, public service ordinance to adopt and implement in year 3. employees, construction site ersonnel 3 Conduct initial training for Parks dept., Fleet services, Public None detection of illicit Showed employees training video. works and streets, environmental health dept. Construction discharges ins ectors 3 Update GIS storm sewer Public, Residents, business, None map to include all facilities Continued to locate outfalls and inlets and visitors, commercial and industrial facilities, public service constructed in the last 3 include in GIS Map. employees, construction site years. ersonnel 4 Evaluate existing Reviewed existing ordinances and Public, Residents, business, None ordinances concluded that they are in compliance with visitors, commercial and industrial permit. facilities, public service employees, construction site ersonnel 4,6 Procedures for Created a checklist with procedures for Public service employees, None construction site inspection construction site inspections, Will be construction site personnel im lemented in r. 3 4 Establish and implement Have a public hotline/website for concerns Public, Residents, business, None procedures for addressing or comments- documented complaints, visitors, commercial and industrial information submitted to received only 2 complaints related to storm facilities, public service the hotline water pollution employees, construction site ersonnel 4 Document any stop work Stopped 4 contractors from working Construction site personnel None orders given because lack of erosion control on their pro'ects. Page 16 of 18 10/12/09 5 Initiate review of draft Began review of iSWM for implementation, Public service employees None iSWM design criteria will complete review and adopt pertinent ortion in r 3. 6 Obtain training materials Purchased 2 storm water management 75 employees that included Parks None for employees and develop videos and show to employees and dept., Fleet services, Public works training program document the number viewed. Will and streets, environmental health continue to show to new hires and existing dept. Construction inspectors em to ees each ear. 6 Implemented and EMS at Trained all employees on good practices at Parks dept., Fleet services, Public the service center the service center through the EMS works and streets, environmental program health dept. Construction ins ectors 6 Develop inspection and Developed inspections procedures and Parks dept., Fleet services, Public maintenance schedules inspection checklist for city employees and works and streets, environmental facilities health dept. Construction inspectors Page 17 of 18 10/12/09 B. Certification I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name (printed): C L/iY ~PI-{ ~ ~~~p5 Title: City Manager ' G-`~ ®~- GoP~ivl.~_ Signature: Date: if L 2~11~ Name (printed . /%OG,~S Title: President -- ~11~ DL~G.~ Signature: G~-Z~ Date: /~ ' .~D -D' Page 1~ of 18 10/12/09