Loading...
Willow Park-CS090924DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM.' PD-244-TH-2 Willow Park, a zoning change request from C (Commercial) to PD-244-TH-2 (Planned Development 244 Townhouse-2) to allow 28 detached townhouse units and to amend the Land Use Plan of the 1996 Comprehensive Plan from Freeway Commercial and Light Industrial/Showroom to Residential - Medium Density on 4.67 acres of property located approximately 337 feet east SH 121 along the north side of Coppell Road at the request of Jason Rose. STAFF REP.: Gary Sieb PROJECT ID# PD-09-0036 DRCDATE: September 24, 2009 & October 1, 2009 CONTACT.' Michael E.I.T. Graduate 972/304-3686 COMMENT STATUS: PRELIMINARY 1. The water line can not be on a dead end of more than 150', it must be looped and in an easement. 2. Show the existing sewer running through lot 1X, and the easement. 3. Show the drainage easement in lot 1X. 4. You will need to provide drainage easements for the proposed storm drain. 5. Extend the storm drain to the creek and place the headwall on piers. Use grouted rock riprap at the outfall. 6. Install a manhole at the dead end of the sewer lines. 7. Place fire hydrants at the entrance and/or according to the Fire marshal's directions. 8. How does the future water benefit? 9. What is the phasing of this project? 10. The parking lots will need to be an X lot and you will need a utility easement for franchises. 11. Nothing will be allowed in the floodplain. 12. Additional comments may be generated during engineering plan review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Willow Park, Preliminary Plat, to establish the street and lot layout for 28 townhouse lots on 4.67 acres of property located approximately 337 feet east SH 121 along the north side of Coppell Road at the request of Jason Rose. STAFF REP.: Gary Sieb PROJECT ID# PP-09-0037 DRCDATE: September 24, 2009 & October 1, 2009 CONTACT.' Michael E.L T. Graduate 972/304-3686 COMMENT STATUS: /PRELIMINARY 1. Show the minimum finish floor elevation. 2. Include a 15' drainage easement for the storm drains 3. Show the sanitary sewer easement and the drainage easement on lot 1X. 4. Include a 15' utility easement for the looped waterline. 5. The parking lots will need to be an X lot and you will need a utility easement for franchises. T H E • C 1 T Y - O F T H E • C 1 T Y - o F COPPELL CITY OF COPPELL COPPELL 1rrV DRC REPORT • x n 5 \ H 9 k n s 1 1♦ Project ID PP-09-0037 Project Name Willow Park Address Project Type Preliminary Plat Application Date 9/15/2009 Case Manager Gary Sieb Project Description to establish the street and lot layout for 28 townhouse lots on 4.67 acres of property 1 of 1 Agency Reviewed By Review Date Comments Building Inspection Michael Arellano 9/23/2009 1) No comments on street and lot layout. Electric Karen Eastman 9/25/2009 No comments received. Engineering Michael Garza 9/23/2009 1. Show the minimum finish floor elevation. 2. Include a 207 drainage easement for the storm drains 3. Show the sanitary sewer easement and the drainage easement on lot 1X. Fire Administration Tim Oates 9/25/2009 1. Loop the 8-inch water lines. 2. Provide a fire hydrant on each named street. Parks and Recreation John Elias 9/24/2009 No comments Planning Department Gary Sieb 9/22/2009 1. Name of Plat and PD need to be the same, already have a Villas subdivision. 2. Label front yard setbacks on Lots 12-14 and 21-23. 3. Plat shown 4 common areas; L.S. and Site Plan show 3. Consistency needed. 4. Indicate number of residential lots beneath title of subdivision. 5 Relocate Floodplain Administrator signature block below Mayor signature. 6. Add line for Planning Chair to sign plat; place Planning Chair and Mayor signature blocks above City Secretary signature block. . 7. Add "Approved and accepted by to utility signature block. 8. If possible, enlarge plat diagram and reduce legal descriptions, but keep on one page.