Loading...
Willow Park-CS091001DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS' ITEM: Willow Park, Preliminary Plat, to establish the street and lot layout for 28 townhouse lots on 4.67 acres of property located approximately 337 feet east SH 121 along the north side of Coppell Road at the request of Jason Rose. STAFF REP.: Gary Sieb PROJECT ID# PP-09-0037 DRC DATE: September 24, 2009 & October 1, 2009 CONTACT.' Michael Garza, E.I. T, Graduate Enkineer 972/304-3686 COMMENT STATUS: PRELIMINARY FINAL Ii~:~D A ~'T~'D D.P_ 7 1. The drainage easements should extend to the ROW. 2. The parking should not be included in the ROW, it should be an X lot. 3. The drainage and floodway easement should be maintained by the HOA in Lot 3X. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-244-TH-2 Willow Park, a zoning change request from C (Commercial) to PD-244-TH-2 (Planned Development 244 Townhouse-2) to allow 28 detached townhouse units and to amend the Land Use Plan of the 1996 Comprehensive Plan from Freeway Commercial and Light Industrial/Showroom to Residential - Medium Density on 4.67 acres of property located approximately 337 feet east SH 121 along the north side of Coppell Road at the request of Jason Rose. STAFF REP.: Gary Sieb PROJECT ID# PD-09-0036 DRCDATE: September 24, 2009 & October 1, 2009 CONTACT.' Michael Garza, E.I.T, GraduateEnQineer 972/304-3686 COMMENT STATUS: PRELIMINARY /FINAL ~~:~D .fT.TTiD D.P_7 1. Extend the storm drain to the creek and place the headwall on piers. Use grouted rock riprap at the outfall. Drainage will be evaluated further during engineering plan review. 2. We will require a manhole at the dead end of the sewer lines. 3. No construction or structure will be allowed in the floodplain. 4. Additional comments may be generated during engineering plan review.