Loading...
North Gateway 9-CS090812Second review comments for North Gateway Center Northwest Corner of SH 121 and Denton Tap City of Coppell August 12, 2009 1. Plan sheet C-19 Shows 8" Solid white line adjacent to deceleration lane. Where is the beginning and end of this line? See attached sketch to my e-mail for detail. 2. What is the thickness and reinforcement for driveway paving? 3. You are moving 3 existing Inlet. Show the way you want your contractor to achieve this. Detail collar (at connection) you want contractor to use. 4. Note on your plan sheet C-4 read "Existing TxDOT Guard Rail to be modify" Would you elaborate? If you are extending TxDOT box culvert, and cover the hole, then existing headwall can also be removed, and guard rail is not needed anymore. If you are not extending TxDOT Box Culvert, then existing head wall need to be protected. My major comment in my preliminary comments to you was about the same issue which you didn't address it. This need to be done as part of this permit 5. Again in several sheet you add a note that width of sidewalk to be 4'. Any sidewalk within TxDOT ROW must be 5' wide. and per TxDOT standard. Please correct your notes. 0 ~ o ~ w ~ = ~ ~ w _ w ~ x 3 0 w ~ _ 3 ~ J I J N P O N Q I AVM3~Ia4 ~ ~ ,lVM3~Ia0 vl w ~I ~ w w = ~ x ~ ~ 3 3 ~ O w ~" ~ o I Z = O I O J O Q n Q ~ ~ W ~ Q '~ ZJ o N ~ W W w `~ c w Z ~' ° ~ w '-' J ~ ~ N Q H ~~ I o ZJ ~ w Q W O '--' J ~ ~ a ~ o ~ ~ w ~ a Y W H I N U ~ ~ Z~ Z ~ I N ~~ W ~ \ Q r ~ ~ ~` I- Z a ~ W ~~ ~ Z ~ w~ 1..~ O w I a= ~' o W a-C7 `'~ I w a ~ O ~ ~~ Q a F Q2 W ~ a~ ~ I ~--~ ~ ~ w x ~ a F- w 3 W O I P