Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
TR0601-EM060214
Opinion of Probable Construction Cost Hooded Left Turn Lane at Tom Thumb Driveway on Denton Tap Item No. Quantit Unit Description Unit Price Total Price 1 2 3 4 1 30 17 1 LS SY SY LS Mobilization & Demobilization Construct Concrete Curb & Median Place Stamped Asphalt in Median Furnish, Install, Maintain & Remove Erosion Control Devices $2,500.00 $70.00 $50.00 $5,000.00 $2,500.00 $2,100.00 $850.00 $5,000.00 Sub-Total $10,450.00 Contingencies (10%) $1,045.00 Grand Total $11,495.00 ~~~ y, \~ TR-a6 ~©~ 2/14/20069:33 AM 1 of 1 Project # 9