Loading...
Coppell Heights 9-CS091020DEVELOPMENT FEE TABLE Project: Coppell Heights Lot 9 irrigation meter Date: 10/20/2009 ~ Dom. TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $0.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $119.73 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $0.00 $0.00 (100% due prior to Filing Plat) Street Light Fee Information not Avai lable (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $149.73 TOTAL AMOUNT DUE PRIOR TO FILING FINAL P LAT $0.00 DEVELOPMENT FEE WORKSHEET PROJECT: Coppell Heights Lot 9 irrigation meter DATE: 10/20/2009 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 = 0 ESU's 1 - 1 inch = 1.67 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 1.67 ESU's @ $900.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: $1, 503.00 $50.00 $0.00 Total #: 1 Irrigation Meter(s) @ $119.73 $119.73 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 0 Fireline Meter(s) @ $0.00 meter provided by developer (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 @ $900.00 ea. (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): $0.00 $30.00 $0.00 $0.00 $0.00 Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: 0 Single-family @ $0.00 per lot 0 Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) $0.00 $0.00 $0.00 Information not Available Information not Available Information not Available Page 2 TRANSMISSION VERIFICATION REPORT TIME 1612612669 16:59 NAME FAX TEL SER.# BROF7J659684 DATE,TIME 16126 16:58 FAX N0.INAME 99724625199 DURATION 66:60:47 PAGE(S) 63 RESULT 0~ MODE STANDARD ECM TRANSMISSION VERIFICATION REPORT TIME 19/2012099 11:02 NAME FAX TEL SER.# BROF7J659084 DATE,TIME 10120 11:91 FAX NO.INAME 99724E25199 DURATION 90;09;21 PAGE(S) 91 RESULT OK MODE STANDARD ECM