Loading...
Duke Lesley-CS091111r ~a ~ ~ o ~ v ~a ~ ,,;. ~ ~ ~' ,~~~~'.d o ';~ ~ k "A„ S ',,a a November 11, 2009 C}/le Burchfield L. H. Lacy Construction Company, Ltd. 1880 Crown Road Dallas, Texas 75234 VIA CERTIFIED 1\IA1L RE: Duke Lesley Addition, Infrastructure Bond No. 1030611 Street Failure(s) on Dividend Dr. & Point West Blvd. SECOND NOTICE Dear Mr. Burchfield: The two-year terns on the above referenced maintenance bond began on February 21, 2008, which was the date of final acceptance of the project. In our meeting recently to inspect the facilities, you assured me that the problems discovered in the paving on Dividend Drive and Point West Boulevard would be addressed, so that fiirther deterioration can be prevented. As of the date of this letter, those locations have not been repaired and further damage is occurring. Please contact me at the number below with your scheduled date of repair at your earliest convenience. Sinly, L¢njy~ Davis ~ C struction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Keith Flowers, Duke Construction, Fax: 9721361-6800 Tod Feazell, L.H. Lacy Construction Company, Ltd. Arch Insurance Company 3 Parkway Suite 1500 Philadelphia PA 19102 255 PARKWAY * P. O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673