Coppell Heights 9-LR080813+CaE4SClENCE ENGINEER#I~C~ ANC- TEST[NG, ICrtC.
___...
'?'t)'C.l~h°'t'.~''l~`IrN~I`~Z.`IC~r~"C1IC.~1~.,/~ C/3`.C,"~l~T`1`'.~~,`iL''C)~I~L~.~L.~
DAILY FtELD REPCIRT
CLIENT: MJR Enviranmenxal inc.
7953 Pinkerxan Cx.
Plana, TX 75025
PROJECT Cappe[I Heights
9~2p S. Belt Line
Cappett, Texas
DATE OF REPORT; 019 3/~
REPORT NCI. {~~-1JM3b33-4
WEATHER CQNDITIONS: SunnylHat TEMPERATURE RANGE: ~~° TCi: 95"
THE C;ETI TECHNICIAN WAS DISPATCHED TO THE ABOVE REFERENCED PROJECT SITE TO PERFORM FIELD TETiNC~ A~
RECZU ESTER.
THE TECHNICIAN MOLDED ONE {1) SET OF FOUR (4) TEST CYLINDERS FROM CONCRETE Pt~4CED FOR MANHOLE.
t.ABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILT. FOLLC?W ON A SEPARATE REPORT,
GETITech: Gustavo
Remarks:
GETi
2712 5aksuma Dr. Suitt 40~
Datias, Texas 75229
~x 97x-asa-ssoo
Reviewed by;
Syed 5. Afs , P',E.
Project Engineer