Coppell Heights 9-LR080818GEOSCtEhICE ENCtNEERtt~tG AND TESTING, t1UC.
•~ 3'1..1~.t~.~t?:~Iti'{T_~E~,rl{:.~ ;t3`C~.%L:f'~1~~ 13~I:;~1~1~1:~:`h.,`t1~f(){1`~;,r,4Z?
DAILY FIELD REPORT
CLIENT: MJR Environmental Inc.
7453 Pinkerton Ct.
Plano, TX 75025
[7ATE Of^ REPORT: OBI1~rt3E
PROJECT Coppett Heights
9213 S. @elt Line
Cappett, Texas
REPORT NO. O!3-C3M3633-5
CONDITIONS: Cloudy/rain
TEMPERATURE RANGE: S3° T®: 86°
THE GETI TECHNICIAN WAS DISPATCHED TO THE ABOVE REFERENCED PROJECT SITE TO PERFORM FIELb TESTING AS
REQUE5TED.
RAIN THE TECHNICIAN LEFT ONE (1) SET OF FOUR (4) TEST CYLINbERS TO BE MADE BY CONTRACTOR FOR
_E STA: 2+42.
TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPARATE REPORT.
GETI T~Ch: 6uskavo
Remarks;
GETI
2712 Satsuma. Or, Suite A00
Deltas, Texas 75224
PNN 972-d86.35Q0
Reviewed by: ~ '°"
Syed . A£sar, P.E.
Project Engincrr