Coppell Heights 9-LR090629DAILY FIELD REPORT
CLIENT: mUR Env Inc.
7qB Pinkerton CL.
Plano, TX 75025
PROJECT: [oppeUHeights
9I0S. Belt Line
Coppett, Texas
WEATHER CONDITIONS: Hot
REPORT NO. 09
TEMPERATURE RANGE: 94' TO. 96�
THE GETI TECHNICIAN WAS DISPATCHED TO THE ABOVE REFERENCED PROJECT SITE TO PERFORM FIELD TESTING AS
�REQUESTED.
!LE [N THE SITE, THE 66TTECHNICIAN MOLDED ONE (1) SET OF FOUR (4) TEST CMNQFRS FROM CONCRETE FOR
'ROACH @ BELTLINE ROAD.
PLEASE SEE ATTACHED REPORT FOR THE ABOVE REFERENCED TEST RESULTS
GETI Tech: Am
Reviewed by-
Project Engineer
GETI
znzSaLsuma Dr. Suite 400
omms, Texas 75229
nmpn'^uoosm