Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Coppell Heights 9-LR090706
Ge COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENTE MJR Environmental Inc. 7953 Pinkerton Ct. Plano, TX 75025 PROJECT: Coppelt Heights 920 S. Belt Line Coppelt, Texas SAMPLE DATE: 6/29/09 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (F): CONCRETE TEMP. ( F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: DATE OF REPORT: 7/27/2009 REPORT NO : 09- DM3633 -20a MJR Engineering CONCRETE SUPPLIER: Redi -Mix 25086657 PLANT /TRUCK: P136 /1189 84° MIX ID NUMBER: 4000 PSI 78° WATER ADDED (gal): 0 1:34 PM SLUMP (inches) (AST C -143) 4 1:40 PM AIR % CONTENT: 0 Hot 19 Approach @ betline 7/27/2009 119,500 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (Ibs) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH 17 7 7/6/2009 105,200 3,721 4000/ 28 Days 18 28 7/27/2009 120,050 4,246 19 28 7/27/2009 119,500 4 227 20 Hold Specification: Making 8 Curing: ASTM C -143 Testing Methods: ASTM C -143, ASTM C -39 GETI Technician: AM Reviewed by: �- Syed S. Afsa' P.E. Project Engineer Geoscience Engineering & Testing, Inc 2712 Satsuma Dr. Suite 400 Dallas, Texas 75229 ph# (972) 488 -3500 FAX: 972 - 488 -8844 t j eoScieme COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENTE MJR Environmental Inc. 7953 Pinkerton Ct. Plano, TX 75025 PROJECT: Coppell Heights 920 S. Belt Line Coppelt, 'Texas SAMPLE DATE: 6/29/09 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (F): CONCRETE TEMP. ( F): TIME BATCHED TIME SAMPLED* WEATHER CONDITION: LOCATION OF PLACEMENT DATE OF REPORT: 7/6/1009 REPORT NO : 09.1-)M3633-ZOa MJR Engineering CONCRETE SUPPLIER: Redi Mix 25086657 PLANT/TRUCK: P136 / 1189 84' MIX ID NUMBER: 4000 PSI 78' WATER ADDED (gat): 0 1:34 PM SLUMP (inches) (AST C -143) 4 1:40 PM AIR % CONTENT, 0 Hot 19 Approach @ bettine 7/27/2009 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (Ibs) COMPRESSIVE ST REQUIRED COMPRESSIVE STRENGTH 17 7 71612009 105,200 - 3,721 1 40001 28 Days is 28 7/27/2009 19 28 7/27/2009 20 Hold Specification: Making & Curing: ASTMC-143 Testing methods: AS[MC-143,ASTMC-39 GETI Technician: AM Reviewed by: Syed Afsar tP E Geosclence Engineering & Testing, Inc 2712 Satsuma Dr. Suite 400 Dattas, Texas 75229 ph# (972) 488-3500 FAX: 972-488-8844