Coppell Heights 9-LR090702DAILY FIELD REPORT
CLIENT: MJR Environmental Inc.
7953 Pinkerton C.t.
Plano, TX 75025
DATE OF REPORT: 07,
PROJECT: Coppett Heights
920 S. Belt Line
Coppell, Texas
WEATHER CONDITIONS: Sunn / Hot
REPORT NO, 09-DM3633.2
TEMPERATURE RANGE: 98' to; 102
THE GETI TECHNICIAN WAS DISPAI CHED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON GOING
WORK AND PICK UP ONE (1) SET OF FOUR (4 CYLINDERS.
WHILF ON-SITE, rHE TECHNICIAN MOLDED ONE (1) SET OF FOUR (4) TEST CYLINDERS FROM CONCRETE
PLACED FOR: WES] APPROACH.
LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON SEPARATE
REPORTS.
6FI f I c0l: Codv
Rrmal kv
Rtmm.ed ty.
Syed i. Afs.)( P�'
'a rnqtm'-r