Loading...
ST0701-MP090918PROJECT STATUS REPORT PROJECT: Southwestern Boulevard From Coppell Road to Belt Line Road CONTRACTOR: L.H. Lacy REPORT DATE: Friday, September 18, 2009 DISTRIBUTION OF REPORT PacTrust Matt Oyen/Benjamin Chessar City of Coppell Keith Marvin/Rick O'Dell Halff Jorge Rodriguez/Dave Littleton L.H. Lacy Kody Harris Report by Kody Harris Project Schedule Permit Status Construction Status Completion Date June 14, 2010 Budget / Changes in the Work Base Budget / Contract Amount Changes To Date Projected Final Cost Submittal Status Submittals Pending Other Issues 7/27/09 See Attached Schedule 5 % complete See Attached Timberline Submittal Log See Attached Timberline RFI Log ahead of schedule $ 2,780,092.76 $0 $ 2,780,092.76 There has been no significant changes this week due to inclement weather. Submittal Log with Detail L. H. LACY COMPANY, Ltd. Include Closed Jobs: No 5262 SWern Blvd (SCoppell - Beltline) Number Rev Description Received From Status 1 0 Concrete Mix Design for Hand E W I Approved Date Placement Paving Date Remarks 2 0 Concrete Mix Design for Machine E W I Approved 8/17/09 Paving 8/28/09 3 0 Concrete Mix Design for Ashlar Ashlar Contracting Company Approved as noted Contracting 8/27/09 4 0 PVC Water Pipe Ferguson Water Works Approved 8/12/09 8/17/09 8/27/09 5 0 Tracer Wire Ferguson Water Works Approved 8/12/09 8/17/09 8/27/09 6 0 Pipe Lube Ferguson Water Works Approved 8/12/09 8/17/09 8/27/09 7 0 Tapping Sleeves Ferguson Water Works Approved 8/12/09 8/17/09 8/27/09 8 0 Gate Valves Ferguson Water Works Approved 8/12/09 8/17/09 8/27/09 9 0 Hydrants Ferguson Water Works Approved 8/12/09 8/17/09 8/27/09 10 0 Ductile Iron Fittings Ferguson Water Works Approved 11 0 Mega Lugs Ferguson Water Works Approved 12 0 Air Release Material Ferguson Water Works Approved 13 0 Sanitary Sewer Manhole Ring and Ferguson Water Works Approved as noted Cover 14 0 Water Service Material Ferguson Water Works Approved Date: 9/18/2009 Show: All Received Sent Returned Forwarded Date Date Date Date Remarks Due Date Due Date 8/14/09 8/17/09 8/27/09 8/28/09 8/14/09 8/17/09 8/27/09 8/28/09 8/12/09 8/17/09 8/27/09 8/28/09 Please clarify Mix Designs 8/12/09 8/17/09 8/27/09 8/28/09 8/12/09 8/17/09 8/27/09 8/28/09 8/12/09 8/17/09 8/27/09 8/28/09 8/12/09 8/17/09 8/27/09 8/28/09 8/12/09 8/17/09 8/27/09 8/28/09 8/12/09 8/17/09 8/27/09 8/28/09 8/12/09 8/17/09 8/27/09 8/28109 8/12/09 8/17/09 8/27/09 8/28/09 8/12/09 8/17/09 8/27/09 8/28/09 8/12/09 8/17/09 8/27/09 8/28/09 Approved with internal chimney seal with extension precast 8/12/09 8/17/09 8/27/09 8/28/09 5262 SWern Blvd (SCoppell - Beltline) Page 1 of 2 Submittal Log with Detail L. H. LACY COMPANY, Ltd. r Include Closed Jobs: No 15 0 Sewer Pipe Ferguson Water Works Approved 8/28/09 8/12/09 1e 0 Sewer Fittings Ferguson Water Works Approved as noted 17 0 PVC Conduit Ferguson Water Works Approved as noted and SDR 35 X10 ft 8/12/09 I8 0 Storm Ring and Cover Ferguson Water Works Approved 19 0 Reinforced Concrete Culvert, Storm Ferguson Water Works Approved Drain and Sewer Pipe 8/12/09 20 0 Precast Reinforced Concrete Manhole Hanson Pipe & Products, Inc. Approved Sections 8/27/09 21 1 A Copy of Approved Traffic Control L.H. Lacy Company Approved Plans 8/20/09 22 0 Storm Drain Embedment Stone Big City Crushed Concrete, L.P Approved 8/31/09 9/4109 23 0 RCCP Water Pipe and Fittings Hanson Pipe & Products, Inc. Approved from City 8/31/09 24 0 Flexicore of Texas Prestressed Ashlar Contracting Company Approved as noted Concrete Slab Beam Shop Drawings 9/4/09 25 0 Mix Designs- Concrete Storm Drain Lattimore Materials Company Approved Structures 5262 SWern Blvd (SCoppell- Beltline) Page 2 of 2 Show: All 8/12/09 _ 8/17/09 8/27/09 8/28/09 8/12/09 8/17/09 8/27/09 8/28109 Sewer Fittings Shall be SDR 26 heavy wall sewer fittings for depth > than 10ft and SDR 35 X10 ft 8/12/09 8/17/09 8/27/09 8/28/09 Clarify Cleanout Casting is attached to this submittal 8/12/09 8/17/09 8/27/09 8/28/09 8/12/09 8/17/09 8/27109 8/28/09 8/12/09 8/17/09 8/27/09 8/28/09 9/14/09 9/16/09 9/16/09 8/20/09 8/20/09 8/27/09 8/28/09 8/31/09 8/31/09 9/4109 Approved by Halff, waiting on approval from City 8/31/09 8/31/09 9/4/09 Review Dimensions 9/2/09 9/2/09 9/4/09 Approved by Halff, waiting on approval from City 5262 SWern Blvd (SCoppell- Beltline) Page 2 of 2 0 Lacy Co . .i I an 2 WEEK LOOK AHEAD Job Name: South Western Blvd Job No.: 6262 Location: Coppell Project Manager: Kody Harris 9/14/2009 lhru 9/25/2009 Subcontractor: Guzman, Ashlar S uperintendent/Foreman: ® Scheduled Pending Fence off the three pecan trees west of bridge Verison line dead that crosses creek Street signs when removed need to be taken to public works Revised Plans Issued for RCP and Drill Shafts Ashlar to begin in one week Safety continue using orange fence around all open holes 14 -Se 15 -Se 16-Se 17 -Se 1 8 -Se 1211-Sep 22 -Se 23 -Se 24 -Se 25 -Se ACTIVITY M T W T F SIS M T W T F Lacy RCP RCP RCP RCP Water Line Water Line Water Line Water Line Water Line Water Line Water Line Water Line Water Llne Guzman Storm Structures Storm Structures Storm Structures Storm Structures Storm Structures Ashlar Ashlar Mob. Drill Shafts Drill Shafts ....... .. Budd Martin ........................ ............... ...................... ..... ::::::...::::::: ::.::::::::............•.•.•. Dallas Light & Barr. ® Scheduled Pending Fence off the three pecan trees west of bridge Verison line dead that crosses creek Street signs when removed need to be taken to public works Revised Plans Issued for RCP and Drill Shafts Ashlar to begin in one week Safety continue using orange fence around all open holes L. H. LACY COMPANY, Ltd. RFI Log with Detail Include Closed Jobs: No 5262 SWern Blvd (SCoppell - Beltline) Number Date Subject Drawing 1 8/17109 Alternate Temporary Crash Cushion 2 8/28/09 Possible Conflict Abutment #4 with 2A Yes 8 -27 -2009; Existing 24" Water Main 28 Yes 8 -27 -2009 3 8128109 TXDOT 2004 Standard Spec, 416.3 -C Show: All RFIs Spec Change Schedule Cost Required Returned Forwarded Section Request Impact Impact Date Date Date 8/21/09 8/21/09 8/27/09 8/28/09 8/27/09 8/27/09 8/28/09 5262 SWern Blvd (SCoppell- Beltline) Page 1 of 1