Loading...
ST0701-CS081110;;; HALFF November 10, 2008 AVO 25816 Mr. Keith Marvin, P.E. City of Coppell Engineering Services 255 Parkway Boulevard Coppell, TX 75019 RE: Southwestern Blvd. Improvement (West of Grapevine Creek) Dear Mr. Marvin: On May 28th, 2008, a subsurface utility investigation was conducted by Halff Associates SUE Group, to locate a 24-inch water line near the bridge at Grapevine Creek along Southwestern Boulevard. The 24-inch water line was located using a geophysical process. We connected a transmitter to the water vault on the east side of the bridge. The transmitter sends a frequency reading to our receiver. Based on the strength of the reading we can locate the line. As the line is being located we either paint or flag the location on the ground. When we have completed our investigation, the surveyors tie the paint marks and flags. This information was then processed with the rest of the survey data, placed into CADD, and used as the location of the existing 24-inch water line in our design files. I have attached exhibit E1 to show the location of the flags tied, and the location of the 24-inch water main used in for the design. The proposed roadway and bridge location are shown in Exhibit E1. Sincerely, HALFF ASSOCIATES Robert Gossett, E.I.T. d Jorge Rodriguez, P.E. HALFF ASSOCIATES, INC. 1201 NORTH BOWSER ROAD RICHARDSON, TX 75081-2275 I:\25000s\25816\Admin\Correspondence\Letters\L,tr 2008-11-10 COC.doc TEL (214) 346-6200 WWW.HALFF.COM FAX (214) 739-0095