2 WEEK LOOK AHEAD
Jon Name: South Western Blvd
Job No.: 6262
Location: Coppell
Pro)ect Manager: KOdy Harris
9114/2009 thru 9/25/2009
Subcontractor: Guzman, Ashlar
Superlntendent/Foreman:
14-Se 15•Se tii-Se 17-Se 18-Se 21-Se 22•Se 23-Sa 24-Se 25-Se
ACTIVITY M T W T F S/S M T W T F
L8C RCP RCP RCP RCP
Water Line Water Line Water Line Water Line Water Line Water Line Water Llne Water Line Weler Llne
Guzman Storm Structures Storm Structures Storm Structures Storm Structures Storm Structures
Ashlar
~: ~
Ashler Mob.
Drill ShafU
Drill Shafts
Budd M
actin ~ ::: :: ::::::::::::~:: ~ ~: ..
..... .... ;:::::::::::::::
..........
......
...............
Dallas LI ht & Barr.
®Scheduled
Fence off the three pecan trees west of bridge
Revised Plans Issued for RCP and Drill Shafts
Verison Ilne dead that crosses creek Ashlar to begin in one week
Pending
Street signs when removed need to be taken to public works
Safety continue using orange fence around all open holes
RFI Log with Detail
L, H. LACY COMPANY, Ltd.
Date: 9/18/2009
Include Closed Jobs: No
5262 SWern Blvd (SCoppell-Beltline)
Show: All RFIs
Number Spec Change
Date Subject Drawing Section Request Schedule Cost Required
Impact Impact Date Returned
Date Forwarded
Date
1 8/17/09 Alternate Temporary Crash Cushion ,, 8!21/09 ' ' 8/21/09
2 8/28/09 Poaslbla ConPllct Abutment #4 with 2A Yes 8-27-2009;
Exleting 24" Water Main 2B Yes 8-27-2009 8/27/09 8/28/09
3 8/28/08 TXDOT 2004 Standard Spec, 418.3-C ` 8/27/09 8/27/09 ' B/28/09
5262 SWern Blvd (SCoppell-Beltline) Page 1 of 1