Loading...
ST0701-MP090914~~~ E~a~~.~# 2 WEEK LOOK AHEAD Jon Name: South Western Blvd Job No.: 6262 Location: Coppell Pro)ect Manager: KOdy Harris 9114/2009 thru 9/25/2009 Subcontractor: Guzman, Ashlar Superlntendent/Foreman: 14-Se 15•Se tii-Se 17-Se 18-Se 21-Se 22•Se 23-Sa 24-Se 25-Se ACTIVITY M T W T F S/S M T W T F L8C RCP RCP RCP RCP Water Line Water Line Water Line Water Line Water Line Water Line Water Llne Water Line Weler Llne Guzman Storm Structures Storm Structures Storm Structures Storm Structures Storm Structures Ashlar ~: ~ Ashler Mob. Drill ShafU Drill Shafts Budd M actin ~ ::: :: ::::::::::::~:: ~ ~: .. ..... .... ;::::::::::::::: .......... ...... ............... Dallas LI ht & Barr. ®Scheduled Fence off the three pecan trees west of bridge Revised Plans Issued for RCP and Drill Shafts Verison Ilne dead that crosses creek Ashlar to begin in one week Pending Street signs when removed need to be taken to public works Safety continue using orange fence around all open holes RFI Log with Detail L, H. LACY COMPANY, Ltd. Date: 9/18/2009 Include Closed Jobs: No 5262 SWern Blvd (SCoppell-Beltline) Show: All RFIs Number Spec Change Date Subject Drawing Section Request Schedule Cost Required Impact Impact Date Returned Date Forwarded Date 1 8/17/09 Alternate Temporary Crash Cushion ,, 8!21/09 ' ' 8/21/09 2 8/28/09 Poaslbla ConPllct Abutment #4 with 2A Yes 8-27-2009; Exleting 24" Water Main 2B Yes 8-27-2009 8/27/09 8/28/09 3 8/28/08 TXDOT 2004 Standard Spec, 418.3-C ` 8/27/09 8/27/09 ' B/28/09 5262 SWern Blvd (SCoppell-Beltline) Page 1 of 1