Denton Creek NH-LR090714~AM ENGINEERING ~ ~ESTING, L.P.
Serving The Geo-Industry Since 1974
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 • FAX: (972) 790-0967
Geotechnical
Materials SE&T Failure
Testing Investigation
Environmental
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST RFpnRr
CLIENT: SCI Construction, LTD STANDARD 6" X 12" v
5467 New Copeland Rd. AREA 28.27 SQ. IN.
Tyler, TX 75703
REPORT DATE: 7/14/09
PROJECT: Pro. Denton Creek Nursing Home
1410 E. Sandy Lake Rd. SAMPLE DATE: 7/13/09
Coppell, TX
PROJECT NO.: 108TX5K9
ATTN: Brandon Parker
REPORT NO.: 29
SE&T TECHNICIAN: Robert James
LOCATION OF PLACEMENT: Sidewalk N. of Sandy Lake 35' W. of E. Entrance PAGE 1 OF 2
~~~~~~ TEST D`AT"A, ~ ~~'_ ~ ~ s =~ ~ a:IfAA' !'~ RiAf".S%~I,IF~P~.IERI~ATA`
Time Arrived: 11:00 AM Concrete Supplier: 3owtown Redi-Mix
Time Left: 3:00 PM Ticket #: 525928
Slump (Inches): 6.5" Truck #: g32
Concrete Tem erature (F): 92 Time Batched: 10:49 AM
Air Content: N/A Time Sampled: 11:45 AM
Total No. of Test Cylinders MadE 8 Product Code: 245
Total Cubic Yards Placed: 65 Cement: N/A
Added Water: N/A FI Ash: N/A
Weather Conditions: Partf Cloud & Hot Coarse A re ate: N/A
Air Tem erature (F): 96 Water: N/A
Unit Wei h t of Fresh Concrete: 147 % Air Content : N/A
$`pecimen Age ,
' Date Unit Wt. Total Load Compressive Type of Strength Required
>>Number Da s Tested pcf Lbs. Strength si Fracture psi/da s
1 A 7 7/20/09 3000/28
1 B 14 7/27/09 '_ ~___ ~ ~ 3000/28
1 C 28 8/10/09 3000/28
1 D 28 8/10/09 3000/28
Curing ASTM C-31 Test Method Cylinders Made By: Cylinders Tested By:
Slump ASTM C-143 ASTM C-39 & 231 SES~T
Remarks:
Very Truly Yours, ~
~~ % - 1-- ----- _
~
M
k~S
i
am , ab Manage & ice President
Texas Professional Firm Registration No: F-001587
This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent.
This report only applies to the samples tested and does not necessarily represent identical nr ~in,iiar man-,.,iA~
G:/2009/108tx5k9/Cpistr/CPiSTR29/SA
SAM ENGINEERING ~[ TESTING L.P.
Serving The Geo-Industry Since 1974
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1810 • FAX: (g72) 790-0967
Geotechnical
Materials SEAT Failure
Testing Investigation
Environmental
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
CLIENT: SCI Construction, LTD
5467 New Copeland Rd. STANDARD 6" X 12"
Tvlar TX 75703 AREA 28.27 SQ. IN.
,~
PROJECT: Pro. Denton Creek Nursing Home
1410 E. Sandy Lake Rd.
Coppell, TX
ATTN: Brandon Parker
SE&T TECHNICIAN: Robert James
LOCATION OF PLACEMENT:
Time Arrived:
Time Left:
Concrete Temperature (F):
Air Content:
Total No. of Test C tinders Made
Total Cubic Yards Placed:
Added Water:
Weather Conditions: Part
Air Temperature (F):
Unit Weight of Fresh Concrete:
' I he
Concrete Supt
Ticket #:
Truck #:
Time Batched:
Product Code:
FIy Ash:
Coarse ,
Air Content
REPORT DATE: 7/14/09
SAMPLE DATE: 7/13/09
PROJECT NO.: 108TX5K9
REPORT NO.: 29
PAGE 2 OF 2
r: Cowtown Redi-Mix
525934
932
1:25 PM
2:20 PM
257
N/A
N/A
N/A
N/A
4.75%
2A 7 7/20/09 psitdays
2B 14 7/27/09 3^c0~;~3
2C 28 8/10/09 3600/28
2D 28 8/10/09 3600/28
uring ASTM C-31 Test Method Cylinders Made By: 3600/28
ump ASTM C-143 ASTM C-39 & 231 Cylinders Tested By:
?markc• SE$T
IVery Truly Yours,
t~/li e Sk' amt, aI~M
ger & Vice President
Texas Professional Firm Registration No: F-001587
t his report is for the sole use of the client addressed. The use of our company name must receive our prior written consent.
This report only applies to the samples tested and does not necessarily represent identical or similar samnlPc
W. Entrance 8'N & 30' W
11:00 AM
3:00 PM
-_
5"
94
4.75- j _
8
65
N/A
Cloudy & Hot
100
14- 7
G:/2009/108tx5k9/Cpistr/CPISTR29/SA