Loading...
Denton Creek NH-LR090714~AM ENGINEERING ~ ~ESTING, L.P. Serving The Geo-Industry Since 1974 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910 • FAX: (972) 790-0967 Geotechnical Materials SE&T Failure Testing Investigation Environmental CONCRETE PLACEMENT INSPECTION & STRENGTH TEST RFpnRr CLIENT: SCI Construction, LTD STANDARD 6" X 12" v 5467 New Copeland Rd. AREA 28.27 SQ. IN. Tyler, TX 75703 REPORT DATE: 7/14/09 PROJECT: Pro. Denton Creek Nursing Home 1410 E. Sandy Lake Rd. SAMPLE DATE: 7/13/09 Coppell, TX PROJECT NO.: 108TX5K9 ATTN: Brandon Parker REPORT NO.: 29 SE&T TECHNICIAN: Robert James LOCATION OF PLACEMENT: Sidewalk N. of Sandy Lake 35' W. of E. Entrance PAGE 1 OF 2 ~~~~~~ TEST D`AT"A, ~ ~~'_ ~ ~ s =~ ~ a:IfAA' !'~ RiAf".S%~I,IF~P~.IERI~ATA` Time Arrived: 11:00 AM Concrete Supplier: 3owtown Redi-Mix Time Left: 3:00 PM Ticket #: 525928 Slump (Inches): 6.5" Truck #: g32 Concrete Tem erature (F): 92 Time Batched: 10:49 AM Air Content: N/A Time Sampled: 11:45 AM Total No. of Test Cylinders MadE 8 Product Code: 245 Total Cubic Yards Placed: 65 Cement: N/A Added Water: N/A FI Ash: N/A Weather Conditions: Partf Cloud & Hot Coarse A re ate: N/A Air Tem erature (F): 96 Water: N/A Unit Wei h t of Fresh Concrete: 147 % Air Content : N/A $`pecimen Age , ' Date Unit Wt. Total Load Compressive Type of Strength Required >>Number Da s Tested pcf Lbs. Strength si Fracture psi/da s 1 A 7 7/20/09 3000/28 1 B 14 7/27/09 '_ ~___ ~ ~ 3000/28 1 C 28 8/10/09 3000/28 1 D 28 8/10/09 3000/28 Curing ASTM C-31 Test Method Cylinders Made By: Cylinders Tested By: Slump ASTM C-143 ASTM C-39 & 231 SES~T Remarks: Very Truly Yours, ~ ~~ % - 1-- ----- _ ~ M k~S i am , ab Manage & ice President Texas Professional Firm Registration No: F-001587 This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent. This report only applies to the samples tested and does not necessarily represent identical nr ~in,iiar man-,.,iA~ G:/2009/108tx5k9/Cpistr/CPiSTR29/SA SAM ENGINEERING ~[ TESTING L.P. Serving The Geo-Industry Since 1974 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1810 • FAX: (g72) 790-0967 Geotechnical Materials SEAT Failure Testing Investigation Environmental CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT CLIENT: SCI Construction, LTD 5467 New Copeland Rd. STANDARD 6" X 12" Tvlar TX 75703 AREA 28.27 SQ. IN. ,~ PROJECT: Pro. Denton Creek Nursing Home 1410 E. Sandy Lake Rd. Coppell, TX ATTN: Brandon Parker SE&T TECHNICIAN: Robert James LOCATION OF PLACEMENT: Time Arrived: Time Left: Concrete Temperature (F): Air Content: Total No. of Test C tinders Made Total Cubic Yards Placed: Added Water: Weather Conditions: Part Air Temperature (F): Unit Weight of Fresh Concrete: ' I he Concrete Supt Ticket #: Truck #: Time Batched: Product Code: FIy Ash: Coarse , Air Content REPORT DATE: 7/14/09 SAMPLE DATE: 7/13/09 PROJECT NO.: 108TX5K9 REPORT NO.: 29 PAGE 2 OF 2 r: Cowtown Redi-Mix 525934 932 1:25 PM 2:20 PM 257 N/A N/A N/A N/A 4.75% 2A 7 7/20/09 psitdays 2B 14 7/27/09 3^c0~;~3 2C 28 8/10/09 3600/28 2D 28 8/10/09 3600/28 uring ASTM C-31 Test Method Cylinders Made By: 3600/28 ump ASTM C-143 ASTM C-39 & 231 Cylinders Tested By: ?markc• SE$T IVery Truly Yours, t~/li e Sk' amt, aI~M ger & Vice President Texas Professional Firm Registration No: F-001587 t his report is for the sole use of the client addressed. The use of our company name must receive our prior written consent. This report only applies to the samples tested and does not necessarily represent identical or similar samnlPc W. Entrance 8'N & 30' W 11:00 AM 3:00 PM -_ 5" 94 4.75- j _ 8 65 N/A Cloudy & Hot 100 14- 7 G:/2009/108tx5k9/Cpistr/CPISTR29/SA