Loading...
Rolling Oaks MC-CS070827(12I7I2009) Ken Griffin - Re: Coppell Cemetery From: Keith Marvin To: mdaniel@ndmce.com CC: Garza, Michael; Griffin, Ken Date: 8/27/2007 8:50 AM Subject: Re: Coppell Cemetery Mike, If they are public lines they should be in easements. Our minimum easement width is 20'. I'm not sure who will be involved in the plan review for this project, but if you have questions about specific lines, shoot me a plan and I'll get it to the right person. Keith Marvin, P.E. Project Engineer (972) 304-3681 »> Mike Daniel <mdanielClndmce.com> 8/23/2007 5:01 PM »> Keith, If you are not the right person to field these questions, please forward it to whomever is. In the cemetery, we will have water, wastewater and storm sewer lines. Which of these lines should be in easements? How wide should the easements be? Thanks. Mike Daniel, PE, RPLS Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite 600 Dallas, Texas 75231 (214) 739-4741 (214) 739-5961 FAX mdanielCalndmce.com Page 1