Chaucer-CS080808(12I7I2009) Ken Griffin - Re: Chaucer Estates -Pond Dredging
From: Keith Marvin
To: monica.scrivner@verizon.com
CC: Griffin, Ken
Date: 8/8/200810:53 AM
Subject: Re: Chaucer Estates -Pond Dredging
Ms. Scrivner,
We have opened bids on this project. We received only one bid for the project. This bid was within our projected budget
for the project.
We would like to sit down and discuss the project with the HOA prior to moving forward. Are you available to meet next
week?
Thanks.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
»> <monica.scrivnerClverizon.com> 7/30/2008 9:00 AM »>
I think that sounds like a good idea. Will you contact me when a
contractor has been selected? For now, just use me as the point of
contact.
Another question, (I know I will be asked this by a homeowner(s)) what
will be the $$ responsibilities of the HOA during this project? It sounds
like we are expected to take care of disconnecting the fountain, should I
expect other items to occur? I need to give the board aheads-up.
Basically, need to know when $$ cost will be paid for by the City & when
the HOA will be expected to pay.
Thank you,
Monica
"Keith Marvin" <kmarvin(alci.co~pell.tx.us>
07/30/2008 08:47 AM
To
Monica A. Scrivner/EMPL/TX/Verizon@VZNotes
cc
Subject
Re: Chaucer Estates -Pond Dredging
Page 1
I'm not sure what is required at this point either. Perhaps when we get a
contractor on board they can meet with your maintenance company and figure
it out.
(12I7I2009) Ken Griffin - Re: Chaucer Estates -Pond Dredging
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
»> <monica.scrivnerClverizon.com> 7/29/2008 3:59 PM »>
Keith -
Don't mean to be dense -but just want to make sure what I need to have
done. Where should the fountain be disconnected from? We can turn the
fountain 'off', but it sounds like more than turning the fountain 'off'.
As you can see, I'm an accountant and not an engineer!!
Thanks,
Monica
"Keith Marvin" <kmarvin(alci.co~pell.tx.us>
07/29/2008 03:14 PM
To
Monica A. Scrivner/EMPL/TX/Verizon@VZNotes
cc
Subject
Re: Chaucer Estates -Pond Dredging
It would be best if you were able to have it disconnected before we begin
work. Let us open bids and award a contract before you actually
disconnect it though.
I'll get back with you after we open bids to give you a better schedule.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
»> <monica.scrivnerClverizon.com> 7/29/2008 3:09 PM »>
Thank you for getting back to me. That is great news.
Page 2
On the fountain, do you need us to take care of disconnecting it before
the work begins? We have a company that we call when we have problems. I
(12I7I2009) Ken Griffin - Re: Chaucer Estates -Pond Dredging
just want to make sure I understand what you need so I can get you an
answer!!
Thanks again,
Monica
"Keith Marvin" <kmarvin(alci.co~pell.tx.us>
07/29/2008 03:03 PM
To
Monica A. Scrivner/EMPL/TX/Verizon@VZNotes
cc
"Ken Griffin" <KGRIFFIN.Town Center.City of Co~peIlClci.co~pelLtx.us>
Subject
Re: Chaucer Estates -Pond Dredging
Ms. Scrivner,
We currently have this project out to bid. We will open bids on August
5th. I anticipate work beginning on the project in September.
One question that has come up relates to the fountain in the middle of the
pond. Who do we need to coordinate with as far as disconnecting that
while the work is done?
Keith.
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
»> <monica.scrivnerCalverizon.com> 7/25/20081.32 PM »>
Hi Ken,
I'm just following up with you from correspondence we had back in May.
wanted to see if a date has been scheduled for the Pond Dredging at
Chaucer Estates?
Thank you,
Monica Scrivner