Loading...
Duke Lesley 3A-CS091204~'I Duk e REALTY CORPORATION December 4, 2009 Mr. Keith Marvin City of Coppell E 255 Parkway Blvd. v Coppell, Texas 75019 RE: Point West VII Parking Expansion Dear Mr. Marvin, Pacheco Koch Consulting Engineers has proposed a temporary solution to a utility conflict for the north drainage channel outfall for the Point West VII Parking Expansion project. Currently, an existing Verizon fiber optics line runs perpendicular to the existing 48" storm drain stub out near the pipe's flowline. This conflict would not allow a same size pipe connection as originally designed without adjusting either the fiber optic line or the existing storm pipe. The temporary solution would be to install a 24" storm drain connection at the existing 48" stub out and match top of pipes. This would allow the fiber optic line to remain in place and not require any adjustments to the existing infrastructure. Duke Realty, the owner of the property, agrees that upon development of the remainder of the site, the temporary 24" storm drain will be replaced with a storm drain appropriately sized to accommodate fully developed conditions for the entire tract. If you have any questions, please do not hesitate to call. We appreciate the City's help and coordination on this matter. Sincerely, Kirk Klatt, P.E. 14241 N. Dallas Parkway Atlanta Cleveland Indianapolis Phoenix South Florida Suite 1000 Baltimore Columbus Minneapolis Raleigh Tampa Dallas, TX 75254 Chicago Dallas Nashville St. Louis Washington DC 972.361.6700 Cincinnati Houston Orlando S. California www.dukerealty.com