Loading...
Duke Lesley 3A-LR091119Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Report of In-Place Density Testing Client: Duke Construction, LP Report No.: 363574 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254-2936 Date of Service: 11/17/2009 Report Date: 11/19/2009 Project: Samsung-Point West VII Parking Lot Expansion Coppell, Texas SerVIC@S: Perform In-Place Density Testing PROJECT DATA Contractor: Duke Construction, LP Standard Counts Test Method: ASTM D-6938 Gauge: Troxler 3430 Moisture Density Gauge Serial No: 34008 Current: 653 Current: 2395 Test Mode: DT Previous: 649 Previous: 2410 MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements MID No. Description % (pcf) Moisture Density 363400 Light Brown /Clay 22.0 99.2 Optimum +4 95 min FIELD DENSITY TESTS Test No Test Location Paving subgrade 20' east, 10' south of northwest corner, 1st lift Paving subgrade 30' east, 15' south of northwest corner, 1st lift Probe M/D Moisture Wet Density Dry Density Density Depth No. % (pcf) (pcf) (% max) 6" 363400 22.3 117.9 96.4 97 ,: ~ °-_ 6" 363400 22.2 122.6 '100.3 101 Remarks: Fill area at northwest corner of site. ~`" . 2 ~ ~ ~- Technician: Steve Sorem Started: 09:30am Finished: 11:30am Rone Engineering Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Ms. Ashley Hair (1-ec copy) _ _ 1-ec Duke Construction, LP Attn: Mr. Andy (Maverick) Otten 1-ec Rone Project Manager Attn: Mr. K. Scott Watson AET K. SCOtt Watson, AET 1-ec City of Coppell Attn: Mr. Lee Stone Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW ) Page 1 of 1 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 800, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of In-Place Density Testing Client: Duke Construction, LP Report No.: 363597 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254-2936 Date of Service: 11/17/2009 Report Date: 11/19/2009 Project: Samsung-Point West VII Parking Lot Expansion Coppell, Texas ServlCes: Perform In-Place Density Testing PROJECT DATA Contractor: Duke Construction, LP Standard Counts Test Method: ASTM D-6938 Gauge: Troxler 3430 Moisture Density Gauge Serial No: 34008 Current: 653 Current: 2395 Test Mode: DT Previous: 645 Previous: 2410 MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements MID No. Description % (pcf) Moisture Density 363400 Light Brown /Clay 22.0 99.2 Optimum +4 95 min FIELD DENSITY TESTS Test Probe M/D Moisture Wet Density Dry Density Density No Test Location Depth No. % (pcf7 (pctl (% max) Paving subgrade '°"""? ~y 1 25' east, 12' south of northwest corner, 2nd lift 6" 363400 24.1 117.6 r 94.8 96 Paving subgrade " 2 35' east, 1 T south of northwest corner, 2nd lift 6" 363400 22.0 122.2 :100.2 101 Remarks: Fill area at northwest corner of site. Technician: Steve Sorem Started: 12:30pm Finished: 02:15pm Rone Engineering Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Ms. Ashley Hair (1-ec copy) _ 1-ec Duke Construction, LP Attn: Mr. Andy (Maverick) Otten 1-ec Rone Project Manager Attn: Mr. K. Scott Watson AET K. Scott Watson, AET 1-ec City of Coppell Attn: Mr. Lee Stone Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMIKW ) Page 1 of 1 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of In-Place Density Testing Client: Duke Construction, LP Report No.: 363642 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254-2936 Date of Service : 11/17/2009 Report Date: 11/19/2009 Project: Samsung-Point West VII Parking Lot Expansion Coppell, Texas ServlCes: Perform In-Place Density Testing PROJECT DATA Contractor: Duke Construction, LP Standard Counts Test Method: ASTM D-6938 Gauge: Troxler 3430 Moisture Density Gauge Serial No: 34008 Current: 653 Current: 2395 Test Mode: DT Previous: 645 Previous: 2410 MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements M/D No. Description % (pcf) Moisture Density 363400 Light Brown /Clay 22.0 99.2 Optimum + 95 min FIELD DENSITY TESTS Test Probe M/D Moisture Wet Density Dry Density Density No Test Location Depth No. % (pcf) (pcf) (% max) Paving subgrade 1 70' east, 12' south of northwest corner 6" 363400 22.0 120.9 99.1 100 Paving subgrade 2 60' east, 10' south of northwest corner 6" 363400 23.4 124.3 100.7 102 Remarks: Fill area at northwest corner of site. Technician: Steve Sorem Started: 03:45pm Finished: 06:OOpm Rone Engineering Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Ms. Ashley Hair (1-ec copy) 1-ec Duke Construction, LP Attn: Mr. Andy (Maverick) Otten 1-ec Rone Project Manager Attn: Mr. K. Scott Watson AET 1-ec City of Coppell Attn: Mr. Lee Stone K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW ) Page 1 of 1