Loading...
ST0003-CS080922PAVING COMPANY P.O. Box 270040 Dallas, Texas 75227-0040 Telephone (972) 289-0723 Fax (972) 216-5637 September 22, 2008 Keith Marvin, P.E. City of Coppell 255 Parkway Coppell, Texas 78019 Re: Coppell Road ST 00-03 4" Water Service Mr. Marvin, Please review the attached quote for connection to an existing 4" water service to the trailer park on the west side of Coppell Rd., north of Ruby. We have added 10% for administrative fees and request 1 additional day to the original contract time. North Texas Contracting - $7,319.00 Tiseo 10% - 731.90 Total - $8,050.90 Sincerely Lance Smith Project Administrator £ata~fieked 1974 North Texas Contracting, Inc 4999 Keller Haslet Road Keller, Texas 76248 817-430-9500 / (F) 817-430-9207 Date: September 8, 2008 Attn: Lance Smith Tiseo Paving Company Coppell Road Reconstruction Re: Differing Conditions Onsite Mr. Smith: NTC encountered an existing 4" water service that serves the existing trailer park on the West side of Coppell Road just North of Ruby. Per the onsite decision of the City's inspector, the 4" water service was replaced from the tie in point to the new main. Anew 4" valve was also installed in this area to regulate flow to the Trailer Park if required. Please see the attached change order pricing for the cost incurred by our firm relating to this issue. Please review and forward to the City as soon as possible. I have attached a breakdown of our cost in a time and material format. Respectfully Submitted, Zach Fusilier Vice President INSTALL 4" VALVE, CUT IN TEE AND RE-CONNECT EX. 4" SERVICE ~ TRAILER PARK COPPELL ROAD CITY OF COPPELL ! TISEO PAVING NORTH TEXAS CONTRACTING NTC LABOR (6 MAN CREW FOR 10 HOUR DAY! 1 DAY REQ'D FOR WORK) SUPERINTENDENT (50x) FOREMAN OPERATOR(2) PIPE LAYER (2 ) PIPE HELPER (2 ) REGULAR REGULAR HOURS RATES CHARGED 5.0 $ 33.75 8.0 $ 25.50 16.0 $ 16.00 16.0 $ t4.00 16.0 $ 12.50 EQUIPMENT SUPERVISORS TRUCK FOREMANSTRUCK TRACK EXCAVATOR CASE 580 LOADER2YD SKID STEER GENERATOR COMPACTOR (RIDE ON 54" ) ROAD PLATE RENTAL DAILY SAFETY ITEMS/ PPE / CONSUMABLES OT OVERTIME TOTAL HOURS RATES LABOR CHARGED ADDED AMOUNT 0 $ 50.63 $ 168.75 2 $ 38.25 $ 280.50 4 $ 24.00 $ 352.00 4 $ 21.00 $ 308.00 4 $ 18.75 $ 275.00 SUBTOTAL LABOR $ 1,384.25 HR 5 $ 9.08 $ 45.40 HR 10 $ 9.08 $ 90.80 HR 10 $ 93.65 $ 936.50 HR 0 $ 63.65 $ - HR 10 $ 81.22 $ 812.20 HR 0 $ 54.93 $ - HR 0 $ 24.58 $ - HR 10 $ 28.61 $ 286.10 HR o $ 17.00 $ - HR 10 $ 7.50 $ 75.00 SUBTOTAL EQUIPMENT $ 2,246.00 MATERIALS & SUBCONTRACTORS 4" GATE VALVE 12"X4"TEE 4" DR-14 CL-200 PVC 12" MEGALUG RESTRAINER 4" MEGALUG RESTRAINER 4" SOLID SLEEVE 12" SOLID SLEEVE THRUST BLOCKING VALVE STACK W/ LID EMBEDMENT TOTALS TOTAL SUB 8 MAIL COSTS TOTAL EQUIPMENT TOTAL LABOR TOTAL NTC COST BURDEN ON LABOR PROFIT NTC BONDING ADJUSTMENT uN1T QUANnT Y uNrc PRICE roraL EA 1 S 385.00 $ 385.00 EA 1 S 248.00 $ 248.00 LF 20 $ 6.25 S 125.00 EA 2 $ 96.00 $ 192.00 EA 4 $ 49.00 $ 196.00 EA 1 $ 120.00 S 120.00 EA 1 S 312.00 $ 312.00 EA 3 S 125,00 $ 375.00 EA 1 S 85.00 $ 85.00 LF 20 $ 4.00 $ 80.00 SUBTOTAL MATERIALS 8: SUBS $ 2,118.00 LS 1 $ 2,118.00 $ 2,118.00 LS 1 $ 2,246.00 $ 2,246.00 LS 1 $ 1,384.25 $ 1,384.25 $ 5,748.25 x 0.425 $ 1,384.25 ; 588.31 x 0.1 ; 8,336.56 $ 633.66 x 0.05 $ 6,970.21 S 348.51 x 0 $ 7,318.72 $ - TOTAL: ; 7,318.72 SAY: $ 7,319.00 NOTES PLEASE ADD ONE DAY TO CONTRACT FOR THIS WORK