ST0003-CN080922zackf From: Lance Smith [Ismith@TiseoPaving.com] Sent: Monday, September 22, 2008 3:52 PM To: Zach Fusilier; Robert Caudill Subject: Coppell Rd. Zach, Please see the following responses to the change orders submitted to date. Delete Bores /add Temp Paving -The City rejected billing these items as bore and elected to pay the concrete and asphalt removal under the removal items in the contract and they paid for the temp asphalt under the temporary asphalt paving item. The water services were paid under the open cut items and I have added the removal items and temp paving to your spreadsheet for payment. Added Catch Basin !HDPE Storm Sewer -The City would like to use existing pay items to pay for this work. Added 36" Catch Basin -The City would like to use existing pay items to pay for this work. Differing Conditions @ Robertson's Pools and other 4 other locations per letters dated 7-23-08, 7-24-08, 7-29-08and 7- 31-08 -The City rejected these stating that the services were cut due to negligence by your crews installing the HDPE Storm Sewer and that the HDPE would have cleared the water services if they were not cut. Added Removal of Trees /Clearing - As agreed in our meeting of 8-15-08, J&T furnished trucks to haul off the tree limbs. Temp Chat Sidewalk -Rejected, not done. Cut & Plug Existing 8" Water Line at 6 locations -The City rejected this stating that cut and plug is subsidiary to the water items. 4" Water Service @ Trailer Park -Submitted still pending approval. Lance Smith Titan Pauinn C:n 972-289-0723 PRICING LOG /TIME LOG COPPELLROAD TISEO PAVING COMPANY NORTH TEXAS CONTRACTING SITE UTILITY ORIGINAL CONTRACT AMOUNT $ 1,085,828.00 CHANGE ORDERS AMOUNT TISEO CO # II ~ DELETE BORES /ADD TEMP PAVING $ (5,493.00) old: ~ ~ DIFFERING CONDITIONS @ ROBERTSON'S POOLS $ 2,392.00 %~4~`~~DDED CATCH BASIN / HDPE STORM SEWER 1 $ 8,404.00 %ADDED 36" CATCH BASIN $ 2,750.00 PAID ADAEQ.BEI~1Da[A~9F- G $ JULY 23, 2008 DIFFERING CONDITIONS $ 3,061.00 JULY 29, 2008 DIFFERING CONDITIONS $ 5,668.00 JULY 31, 2008 DIFFERING CONDITIONS $ 1,402.00 TEMP. CHAT SIDEWALK $ 9,000.00 TRIALER PARK WATER SERVICE /TIE IN $ 7,319.00 _ouec~~~uTn~~ gp~,1,~r1~1 n~C ~ $ r~r CUT & PLUG EX. WATER ~~ $ 5,550.00 TOTAL CHANGE ORDER AMOUNT PENDING $ 45,163.00 ~~ ~ d G~~ ~~ ~- ~ ~, ,1 '~ S~ ~ ~ y . North Texas Contracting, Inc 4999 Keller Haslet Road Keller, Texas 76248 817-430-9500 / (F) 817-430-9207 Date: June 30, 2008 Attn: Lance Smith Tiseo Paving Company Coppell Road Reconstruction Re: Delete Bores & Add Open Cut w/ Temporary Paving Mr. Smith: Due to onsite conditions our firm has been unable to install the waterline crossings using the by other than open cut method. We have encountered multiple franchise utilities as deep as 9' and the onsite locating has been inaccurate as much as 10' in any direction. It has proven more beneficial and timely to open cut the crossings and install the water line using the open cut method. By installing the waterline open cut we have been required to saw cut the existing paving, remove the paving and install temporary hot mix asphalt in these areas. The crossings are also taking longer than mainline installation due to existing utilities and the adjacent pavement protection. Please see the attached change order request which includes the credit for the unused bore items and the addition of the crossing items. The new items include the cost of the pipe, embedment, open cut installation costs, saw cutting, pavement removal and temporary paving. Based on the availability of the boring subcontractor and the lengthy pit excavation and shoring process, our firm believes this change wilt ultimately aid in a timelier completion of the water line. Please rauiew this prnnncal and proyida direction ac coon ac pnccihle_ Respectfully Submitted, Zach Fusilier Vice President North Texas Contracting, Inc. Job Name: COPPELL ROAD 10/16/2008 Location: COPPELL, TX 8:36 AM Bid Date: 6-Mar-08 Bid Time: 2:00 PM Revised 10/02 Item Description Bid Bid No. Qty Unit Unit Amount 0.00 0.00 0.00 0.00 60 6" PVC, OTHER THAN OPEN CUT -42 LF 180.00 -7,560.00 61 8" PVC, OTHER THAN OPEN CUT -333 LF 210.00 -69,930.00 62 12" PVC, OTHER THAN OPEN CUT -69 LF 230.00 -15,870.00 NEW 6" PVC CROSSING W/ TEMP PAVING 42 LF 166.00 6,972.00 NEW 8" PVC CROSSING W/ TEMP PAVING 333 LF 199.00 66,267.00 NEW 12" PVC CROSSING W/TEMP PAVING 69 LF 212.00 14,628.00 0.00 0.00 TOTAL NET CREDIT TO CITY $ (5,493.00) 0.00 0.00 0.00 0.00 TOTAL ADDED DAYS FOR CHANGE 0 CAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 n 00 n 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 North Texas Contracting, Inc 4999 Keller Haslet Road Keller, Texas 76248 817-430-9500 / (F) 817-430-9207 Date: July 14, 2008 Attn: Lance Smith Tiseo Paving Company Coppell Road Reconstruction Re: Differing Conditions Onsite Mr. Smith: NTC has discovered an existing water line crossing that appears to have been bored and tied into the existing waterline on the West side of Coppell Road in front of Robertson's Pools. Due to the existing water pipe being installed vertically above the bore the waterline was directly in the way of the proposed 24" HDPE storm line. Per the onsite decision of the City's inspector, the 24" line was deflected around the waterline and was able to be installed without any additional materials. As a result of this conflict the utility crew incurred one half day of delay which includes the cost to hand excavate and expose the existing line, remove in place work, and re-install the storm pipe around the waterline. This ex. line is not detailed on the bid documents therefore the cost to uncover and investigate the line was not included in the original proposal nor was the cost to slow down the main line storm installation. Please see the attached change order pricing for the cost incurred by our firm relating to this issue. Please review and forward to the City as soon as possible. I have attached a breakdown of our cost in a t:me and material format. Respectfully Submitted, Zach Fusilier Vice President CREW COST FOR DELAY AT ROBERTSON'S POOL EX. WATER LINE COPPELLROAD CITY OF COPPELL / TISEO PAVING NORTH TEXAS CONTRACTING NTC LABOR (6 MAN CREW FOR 10 HOUR DAY AT 1/2 DAY REQ'D FOR WORK) SUPERINTENDENT (50%) FOREMAN OPERATOR(2) PIPE LAYER (2 ) PIPE HELPER (2 ) REGULAR REGULAR HOURS RATES CHARGED 2.5 $ 33.75 5.0 $ 25.50 10.0 $ 16.00 10.0 $ 14.00 10.0 $ 12.50 EQUIPMENT SUPERVISORS TRUCK FOREMANSTRUCK TRACK EXCAVATOR CASE 580 LOADER 2YD SKID STEER GENERATOR COMPACTOR (RIDE ON 54" ) ROAD PLATE RENTAL DAILY SAFETY ITEMS/ PPE / CONSUMABLES OT OVERTIME TOTAL HOURS RATES LABOR CHARGED ADDED AMOUNT 0 $ 50.63 $ 84.38 0 $ 38.25 $ 127.50 0 $ 24.00 $ 160.00 0 $ 21.00 $ 140.00 0 $ 18.75 $ 125.00 SUBTOTAL LABOR $ 636.88 HR 2.5 $ 9.08 $ 22.70 HR 5 $ 9.08 $ 45.40 HR 5 $ 93.65 $ 468.25 HR 0 $ 63.65 $ - HR 5 $ 81.22 $ 406.10 HR 0 $ 54.93 $ - HR 0 $ 24.58 $ - HR 5 $ 28.61 $ 143.05 HR 0 $ 17.00 $ - HR 5 $ 7.50 $ 37.50 SUBTOTAL EQUIPMENT $ 1,123.00 MATERIALS & SUBCONTRACTORS UNIT QUANTITY UNIT PRICE TOTAL NONE USED TOTALS TOTAL SUB 8 MAIL COSTS TOTAL EQUIPMENT TOTAL LABOR TOTAL NTC COST BURDEN ON LABOR OVERHEAD PROFIT NTC BONDING ADJUSTMENT SUBTOTAL MATERIALS 8~ SUBS $ - LS 1 $ - $ - LS 1 $ 1,123.00 $ 1,123.00 LS 1 $ 636.88 $ 636.88 $ 1,759.88 0.425 $ 636.88 $ 270.67 0.1 $ 2,030.55 $ 203.05 0.05 $ 2,233.60 $ 111.68 °/ 0.02 $ 2,345.28 $ 46.91 TOTAL: $ 2,392.19 SAY: $ 2,392.00 NOTES PLEASE ADD 112 DAY TO CONTRACT FOR CHANGE North Texas Contracting, Inc 4999 Keller Haslet Road Keller, Texas 76248 817-430-9500 / (F) 817-430-9207 Date: July 14, 2008 Attn: Lance Smith Tiseo Paving Company Coppell Road Reconstruction Re: Differing Conditions Onsite Mr. Smith: The City has requested installation of additional storm sewer items to accommodate an existing storm water system on Coppell Road immediately North of Robertson's Pools. The City has requested a 36" grate inlet, three 8" tee outlets and the connection to three existing storm water inlets including 8" pipe to facilitate the connections. Please see the attached breakdown of costs and the material prices for validity. Please review and forward accordingly. Respectfully Submitted, Zach Fusilier Vice President ADD 36" CATCH BASIN & 3 - 24" X 8" TEES WITH CONNECTIONS TO EX. INLETS COPPELLROAD CITY OF COPPELL / TISEO PAVING NORTH TEXAS CONTRACTING NTC LABOR (6 MAN CREW FOR 10 HOUR DAY / 1 DAY REQ'D FOR WORK) SUPERINTENDENT (50%) FOREMAN OPERATOR(2) PIPE LAYER (2 ) PIPE HELPER (2 ) REGULAR REGULAR HOURS RATES CHARGED 5.0 $ 33.75 8.0 $ 25.50 16.0 $ 16.00 16.0 $ 14.00 16.0 $ 12.50 EQUIPMENT SUPERVISORS TRUCK FOREMANSTRUCK TRACK EXCAVATOR CASE 580 LOADER 2YD SKID STEER GENERATOR COMPACTOR (RIDE ON 54" ) ROAD PLATE RENTAL DAILY SAFETY ITEMS/ PPE / CONSUMABLES OT OVERTIME TOTAL HOURS RATES LABOR CHARGED ADDED AMOUNT 0 $ 50.63 $ 168.75 2 $ 38.25 $ 280.50 4 $ 24.00 $ 352.00 4 $ 21.00 $ 308.00 4 $ 18.75 $ 275.00 SUBTOTAL LABOR $ 1,384.25 HR 5 $ 9.08 $ 45.40 HR 10 $ 9.08 $ 90.80 HR 10 $ 93.65 $ 936.50 HR 0 $ 63.65 $ - HR 10 $ 81.22 $ 812.20 HR 0 $ 54.93 $ - HR 0 $ 24.58 $ - HR 10 $ 28.61 $ 286.10 HR 0 $ 17.00 $ - HR 10 $ 7.50 $ 75.00 SUBTOTAL EQUIPMENT $ 2,246.00 MATERIALS 8~ SUBCONTRACTORS UNIT QUANTITY UNIT PRICE TOTAL 24" X 8" HDPE TEE /WYE FITTING 24" HDPE SPLIT COUPLING 8" HDPE SPLIT COUPLING 8" X 20" HDPE PIPE TOTALS TOTAL SUB & MAT'L COSTS TOTAL EQUIPMENT TOTAL LABOR TOTAL NTC COST BURDEN ON LABOR OVERHEAD PROFIT NTC BONDING ADJUSTMENT EA 3 $ 650.00 $ 1,950.00 EA 6 $ 120.00 $ 720.00 EA 3 $ 16.00 $ 48.00 LF 40 $ 8.50 $ 340.00 SUBTOTAL MATERIALS & SUBS $ 3,058.00 LS 1 $ 3,058.00 $ 3,058.00 LS 1 $ 2,246.00 $ 2,246.00 LS 1 $ 1,384.25 $ 1,384.25 $ 6,688.25 0.425 $ 1,384.25 $ 588.31 0.1 $ 7,276.56 $ 727.66 0.05 $ 8,004.21 $ 400.21 0 $ 8,404.42 $ - TOTAL: $ 8,404.42 SAY: $ 8,404.00 North Texas Contracting, Inc. Job Name: COPPELL ROAD 10/16/2008 Location: COPPELL, TX 8:35 AM Bid Date: 6-Mar-08 Bid Time: 2:00 PM Revised 10/02 Item Description Bid Bid No. Qty Unit Unit Amount ADDED 36" GRATE INLET 0.00 0.00 0.00 0.00 36" CATCH BASIN 1 EA 2,750.00 2,750.00 0.00 0.00 TOTAL CHANGE AMOUNT $ 2,750.00 0.00 0.00 0.00 0.00 TOTAL ADDED DAYS FOR CHANGE 1 CAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 North Texas Contracting, Inc 4999 Keller Haslet Road Keller, Texas 76248 817-430-9500 / (F) 817-430-9207 Date: July 14, 2008 Attn: Lance Smith Tiseo Paving Company Coppell Road Reconstruction Re: Differing Conditions Onsite Mr. Smith: NTC has discovered an existing water line crossing that appears to have been bored and tied into the existing waterline on the West side of Coppell Road in front of Robertson's Pools. Due to the existing water pipe being installed vertically above the bore the waterline was directly in the way of the proposed 24" HDPE storm line. Per the onsite decision of the City's inspector, the 24" line was deflected around the waterline and was able to be installed without any additional materials. As a result of this conflict the utility crew incurred one half day of delay which includes the cost to hand excavate and expose the existing line, remove in place work, and re-install the storm pipe around the waterline. This ex. line is not detailed on the bid documents therefore the cost to uncover and investigate the line was not included in the original proposal nor was the cost to slow down the main line storm installation. Please see the attached change order pricing for the cost incurred by our firm relating to this issue. Please review and forward to the City as soon as possible. I have attached a breakdown of our cost in a times and matarial format Respectfully Submitted, Zach Fusilier Vice President a CREW COST FOR DELAY AT EX. WATER LINE "D" CONNECTION COPPELL ROAD CITY OF COPPELL / TISEO PAVING NORTH TEXAS CONTRACTING NTC LABOR (6 MAN CREW FOR 10 HOUR DAY AT 1/2 DAY REQ'D FOR WORK) SUPERINTENDENT (50%) FOREMAN OPERATOR(2) PIPE LAYER (2 ) PIPE HELPER (2 ) EQUIPMENT SUPERVISORS TRUCK FOREMANSTRUCK TRACK EXCAVATOR CASE 580 LOADER2YD SKID STEER GENERATOR COMPACTOR (RIDE ON 54" ) ROAD PLATE RENTAL DAILY SAFETY ITEMS/ PPE / CONSUMABLES MATERIALS 8: SUBCONTRACTORS RENTED SHORE JACKS & FENN FORM (6 ) TOTALS TOTAL SUB & MATL COSTS TOTAL EQUIPMENT TOTAL LABOR TOTAL NTC COST REGULAR REGULAR OT OVERTIME TOTAL HOURS RATES HOURS RATES LABOR CHARGED CHARGED ADDED AMOUNT 2.5 $ 33.75 0 $ 50.63 $ 84.38 5.0 $ 25.50 0 $ 38.25 $ 127.50 10.0 $ 16.00 0 $ 24.00 $ 160.00 10.0 $ 14.00 0 $ 21.00 $ 140.00 10.0 $ 12.50 0 $ 18.75 $ 125.00 SUBTOTAL LABOR $ 636.88 HR 2.5 $ 9.08 $ 22.70 HR 5 $ 9.08 $ 45.40 HR 5 $ 93.65 $ 468.25 HR 0 $ 63.65 $ - HR 5 $ 81.22 $ 406.10 HR 0 $ 54.93 $ - HR 0 $ 24.58 $ - HR 5 $ 28.61 $ 143.05 HR 0 $ 17.00 $ - HR 5 $ 7.50 $ 37.50 SUBTOTAL EQUIPMENT $ 1,123.00 UNIT QUANTITY UNIT PRICE TOTAL DAY 0.5 $ 1,135.00 $ 567.50 SUBTOTAL MATERIALS ~ SUBS $ 567.50 LS 1 LS 1 LS 1 BURDEN ON LABOR % 0.425 OVERHEAD % 0.1 PROFIT % 0.05 NTC BONDING ADJUSTMENT % 0.02 $ 567.50 $ 567.50 $ 1,123.00 $ 1,123.00 $ 636.88 $ 636.88 $ 2,327.38 $ 636.88 $ 270.67 $ 2,598.05 $ 259.80 $ 2,857.85 $ 142.89 $ 3,000.74 $ 60.01 TOTAL: $ 3,060.76 SAY: $ 3,061.00 NOTES PLEASE ADD 112 DAY TO CONTRACT FOR CHANGE North Texas Contracting, Inc 4999 Keller Haslet Road Keller, Texas 76248 817-430-9500 / (F) 817-430-9207 Date: August 18, 2008 Attn: Lance Smith Tiseo Paving Company Coppell Road Reconstruction Re: Differing Conditions Onsite Mr. Smith: On July 24, 2008 NTC discovered an existing water service crossing the ex. road and tied into the existing waterline on the West side of Coppell Road just North of Robertson's Pools. Due to the existing water service being installed in the location it was the service was directly in the way of the proposed 24" HDPE storm line. Per the onsite decision of the City's inspector, the water service was cut and replaced around the proposed 24" storm line. As a result of this conflict the utility crew incurred one quarter day of delay which includes the cost to provide copper fittings and service line for the repair. This ex. service is not detailed on the bid documents therefore the cost to uncover and investigate the line was not included in the original proposal nor was the cost to slow down the main line storm installation. Please see the attached change order pricing for the cost incurred by our firm relating to this issue. Please review and forward to the City as soon as possible. I have attached a breakdown of our cost in a time and material format. Respectfully Submitted, Zach Fusilier Vice President North Texas Contracting, Inc 4999 Keller Haslet Road Keller, Texas 76248 817-430-9500 / (F) 817-430-9207 Date: August 18, 2008 Attn: Lance Smith Tiseo Paving Company Coppell Road Reconstruction Re: Differing Conditions Onsite Mr. Smith: On July 29, 2008 NTC discovered two existing 3/4" and one 1" existing water services crossing the ex. road and tied into the existing waterline on the West side of Coppell Road just South of Cooper. Our firm also crossed and was forced to replace a 4" clay sewer service. Due to the existing services being installed in their location the services were directly in the way of the proposed 24" HDPE storm line. Per the onsite decision of the City's inspector, the services were cut and replaced around the proposed 24" storm line. As a result of this conflict the utility crew incurred one day of delay which includes the cost to provide copper and PVC fittings for the repairs. These ex. services are not detailed on the bid documents therefore the cost to uncover and investigate these lines was not included in the original proposal nor was the cost to slow down the main line storm installation. Please see the attached change order pricing for the cost incurred by our firm relating to this issue. Please review and forward to the City as soon as possible. I have attached a breakdown of our cost in a time and material format. Respectfully Submitted, Zach Fusilier Vice President CREW COST FOR DELAY AT EX. WATER SERVICES (3 EA) 8~ EX. SEWER SERVICE (1 EA ) COPPELL ROAD CITY OF COPPELL / TISEO PAVING NORTH TEXAS CONTRACTING NTC LABOR (6 MAN CREW FOR 10 HOUR DAY AT 1 DAY REQ'D FOR WORK) SUPERINTENDENT (50%) FOREMAN OPERATOR(2) PIPE LAYER (2 ) PIPE HELPER (2 ) EQUIPMENT REGULAR REGULAR HOURS RATES CHARGED 5.00 $ 33.75 8.0 $ 25.50 16.0 $ 16.00 16.0 $ 14.00 16.0 $ 12.50 OT OVERTIME TOTAL HOURS RATES LABOR CHARGED ADDED AMOUNT 0 $ 50.63 $ 168.75 2 $ 38.25 $ 280.50 4 $ 24.00 $ 352.00 4 $ 21.00 $ 308.00 4 $ 18.75 $ 275.00 SUBTOTAL LABOR $ 1,384.25 SUPERVISORS TRUCK HR 10 $ 9.08 $ 90.80 FOREMANS TRUCK HR 10 $ 9.08 $ 90.80 TRACK EXCAVATOR HR 10 $ 93.65 $ 936.50 CASE 580 HR 0 $ 63.65 $ - LOADER 2YD HR 10 $ 81.22 $ 812.20 SKID STEER HR 0 $ 54.93 $ - GENERATOR HR 0 $ 24.58 $ - COMPACTOR (RIDE ON 54") HR 10 $ 28.61 $ 286.10 ROAD PLATE RENTAL HR 0 $ 17.00 $ - DAILY SAFETY ITEMS/ PPE / CONSUMABLES HR 10 $ 7.50 $ 75.00 SUBTOTAL EQUIPMENT $ 2,291.40 MATERIALS 8~ SUBCONTRACTORS UNIT QUANTITY UNIT PRICE TOTAL l4VF'PEK MHItKIHLJ LS l ~ 45L.00 y 4bL.00 PVC MATERIALS LS 1 $ 65.00 $ 85.00 SUBTOTAL MATERIALS 8~ SUBS $ 547.00 TOTALS TOTAL SUB & MAIL COSTS LS 1 $ 547.00 $ 547.00 TOTAL EQUIPMENT LS 1 $ 2,291.40 $ 2,291.40 TOTAL LABOR LS 1 $ 1,384.25 $ 1,384.25 TOTAL NTC COST $ 4,222.65 BURDEN ON LABOR % 0.425 $ 1,384.25 $ 588.31 OVERHEAD % 0.1 $ 4,810.96 $ 481.10 PROFIT % 0.05 $ 5,292.05 $ 264.60 NTC BONDING ADJUSTMENT % 0.02 $ 5,556.65 $ 111.13 TOTAL: $ 5,667.79 SAY: $ 5,668.00 NOTES PLEASE ADD 1 DAY TO CONTRACT FOR CHANGE North Texas Contracting, Inc 4999 Keller Haslet Road Keller, Texas 76248 817-430-9500 / (F) 817-430-9207 Date: August 18, 2008 Attn: Lance Smith Tiseo Paving Company Coppell Road Reconstruction Re: Differing Conditions Onsite Mr. Smith: On July 31, 2008 NTC discovered an existing 3/" water service crossing the ex. road and tied into the existing waterline on the West side of Coppell Road just South of Cooper. Due to the existing water service being installed in the location it was the service was directly in the way of the proposed 24" HDPE storm line. Per the onsite decision of the City's inspector, the water service was cut and replaced around the proposed 24" storm line. As a result of this conflict the utility crew incurred one quarter day of delay which includes the cost to provide copper fittings and service line for the repair. This ex. service is not detailed on the bid documents therefore the cost to uncover and investigate the line was not included in the original proposal nor was the cost to slow down the main line storm installation. Please see the attached change order pricing for the cost incurred by our firm relating to this issue. Please review and forward to the City as soon as possible. I have attached a breakdown of our cost in a time and material format. Respectfully Submitted, Zach Fusilier Vice President CREW COST FOR DELAY AT EX. 3/4" WATER SERVICE COPPELLROAD CITY OF COPPELL / TISEO PAVING NORTH TEXAS CONTRACTING NTC LABOR (6 MAN CREW FOR 10 HOUR DAY AT 1/4 DAY REQ'D FOR WORK) REGULAR REGULAR OT OVERTIME TOTAL HOURS RATES HOURS RATES LABOR CHARGED CHARGED ADDED AMOUNT SUPERINTENDENT (50%) 1.25 $ 33.75 0 $ 50.63 $ 42.19 FOREMAN 2.5 $ 25.50 0 $ 38.25 $ 63.75 OPERATOR (2) 5.0 $ 16.00 0 $ 24.00 $ 80.00 PIPE LAYER (2) 5.0 $ 14.00 0 $ 21.00 $ 70.00 PIPE HELPER (2) 5.0 $ 12.50 0 $ 18.75 $ 62.50 SUBTOTAL LABOR $ 318.44 EQUIPMENT SUPERVISORS TRUCK HR 1.25 $ 9.08 $ 11.35 FOREMANS TRUCK HR 2.5 $ 9.08 $ 22.70 TRACK EXCAVATOR HR 2.5 $ 93.65 $ 234.13 CASE 580 HR 0 $ 63.65 $ - LOADER 2YD HR 2.5 $ 81.22 $ 203.05 SKID STEER HR 0 $ 54.93 $ - GENERATOR HR 0 $ 24.58 $ - COMPACTOR (RIDE ON 54") HR 2.5 $ 28.61 $ .71.53 ROAD PLATE RENTAL HR 0 $ 17.00 $ - DAILY SAFETY ITEMS/ PPE / CONSUMABLES HR 2.5 $ 7.50 $ 18.75 SUBTOTAL EQUIPMENT $ 561.50 MATERIALS 8~ SUBCONTRACTORS UNIT QUANTITY U NIT PRICE TOTAL COPPER MATERIALS LS 1 $ 175.00 $ 175.00 SUBTOTAL MATERIALS 8~ SUBS $ 175.00 TOTALS TOTAL SUB & MAT'L COSTS LS 1 $ 175.00 $ 175.00 TOTAL EQUIPMENT LS 1 $ 561.50 $ 561.50 TOTAL LABOR LS 1 $ 318.44 $ 318.44 TOTAL NTC COST $ 1,054.94 BURDEN ON LABOR % 0.425 $ 318.44 $ 135.34 OVERHEAD % 0.1 $ 1,190.27 $ 119.03 PROFIT % 0.05 $ 1,309.30 $ 65.47 NTC BONDING ADJUSTMENT % 0.02 $ 1,374.77 $ 27.50 TOTAL: $ 1,402.26 SAY: $ 1,402.00 NOTES PLEASE ADD 112 DAY TO CONTRACT FOR CHANGE North Texas Contracting, Inc. Job Name: COPPELL ROAD 10/16/2008 Location: COPPELL, TX 8:36 AM Bid Date: 6-Mar-08 Bid Time: 2:00 PM Revised 10/02 Item Description Bid Bid No. Qty Unit Unit Amount INSTALL TEMPORARY SIDEWALK FOR SCHOOL TRAFFIC 0.00 0.00 0.00 0.00 EXCAVATE /GRADE FOR SIDEWALK 1 LS 1,500.00 1,500.00 4" # 10 CHAT WALKING PATH 2000 SF 2.50 5,000.00 REMOVE PATH (PHASE 2) 1 LS 2,500.00 2,500.00 0.00 0.00 TOTAL CHANGE AMOUNT $ 9,000.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL ADDED DAYS FOR CHANGE 2 CAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0, 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 North Texas Contracting, Inc 4999 Keller Haslet Road Keller, Texas 76248 817-430-9500 / (F) 817-430-9207 Date: September 8, 2008 Attn: Lance Smith Tiseo Paving Company Coppell Road Reconstruction Re: Differing Conditions Onsite Mr. Smith: NTC encountered an existing 4" water service that serves the existing trailer park on the West side of Coppell Road just North of Ruby. Per the onsite decision of the City's inspector, the 4" water service was replaced from the tie in point to the new main. Anew 4" valve was also installed in this area to regulate flow to the Trailer Park if required. Please see the attached change order pricing for the cost incurred by our firm relating to this issue. Please review and forward to the City as soon as possible. I have attached a breakdown of our cost in a time and material format. Respectfully Submitted, Zach Fusilier Vice President INSTALL 4" VALVE, CUT IN TEE AND RE-CONNECT EX. 4" SERVICE @ TRAILER PARK COPPELLROAD CITY OF COPPELL / TISEO PAVING NORTH TEXAS CONTRACTING NTC LABOR (6 MAN CREW FOR 10 HOUR DAY / 1 DAY REQ'D FOR WORK) SUPERINTENDENT (50%) FOREMAN OPERATOR(2) PIPE LAYER (2 ) PIPE HELPER (2 ) REGULAR REGULAR HOURS RATES CHARGED 5.0 $ 33.75 8.0 $ 25.50 16.0 $ 16.00 16.0 $ 14.00 16.0 $ 12.50 EQUIPMENT SUPERVISORS TRUCK FOREMANS TRUCK TRACK EXCAVATOR CASE 580 LOADER2YD SKID STEER GENERATOR COMPACTOR (RIDE ON 54" ) ROAD PLATE RENTAL DAILY SAFETY ITEMS/ PPE / CONSUMABLES OT OVERTIME TOTAL HOURS RATES LABOR CHARGED ADDED AMOUNT 0 $ 50.63 $ 168.75 2 $ 38.25 $ 280.50 4 $ 24.00 $ 352.00 4 $ 21.00 $ 308.00 4 $ 18.75 $ 275.00 SUBTOTAL LABOR $ 1,384.25 HR 5 $ 9.08 $ 45.40 HR 10 $ 9.08 $ 90.80 HR 10 $ 93.65 $ 936.50 HR 0 $ 63.65 $ - HR 10 $ 81.22 $ 812.20 HR 0 $ 54.93 $ - HR 0 $ 24.58 $ - HR 10 $ 28.61 $ 286.10 HR 0 $ 17.00 $ - HR 10 $ 7.50 $ 75.00 SUBTOTAL EQUIPMENT $ 2,246.00 MATERIALS 8~ SUBCONTRACTORS 4" GATE VALVE 12"X4"TEE 4" DR-14 CL-200 PVC 12" MEGALUG RESTRAINER 4'' IVIEGALI.IG I<tS I RAlIVE1C 4" SOLID SLEEVE 12" SOLID SLEEVE THRUST BLOCKING VALVE STACK W/ LID EMBEDMENT TOTALS TOTAL SUB 8 MAIL COSTS TOTAL EQUIPMENT TOTAL LABOR TOTAL NTC COST BURDEN ON LABOR OVERHEAD PROFIT NTC BONDING ADJUSTMENT UNIT QUANTITY UNIT PRICE TOTAL EA 1 $ 385.00 $ 385.00 EA 1 $ 248.00 $ 248.00 LF 20 $ 6.25 $ 125.00 EA 2 $ 96.00 $ 192.00 CA 4 $ 49.VV $ 190.VU EA 1 $ 120.00 $ 120.00 EA 1 $ 312.00 $ 312.00 EA 3 $ 125.00 $ 375.00 EA 1 $ 85.00 $ 85.00 LF 20 $ 4.00 $ 60.00 SUBTOTAL MATERIALS 8 SUBS $ 2,118.00 LS 1 $ 2,118.00 $ 2,118.00 LS 1 $ 2,246.00 $ 2,246.00 LS 1 $ 1,384.25 $ 1,384.25 $ 5,748.25 0.425 $ 1,384.25 $ 588.31 0.1 $ 6,336.56 $ 633.66 °/ 0.05 $ 6,970.21 $ 348.51 0 $ 7,318.72 $ - TOTAL: $ 7,318.72 SAY: $ 7,319.00 NOTES PLEASE ADD ONE DAY TO CONTRACT FOR THIS WORK North Texas Contracting, Inc. Job Name: COPPELL ROAD Location: COPPELL, TX Bid Date: 6-Mar-08 Bid Time: 2:00 PM Revised 10/02 10/16/2008 8:35 AM Item Description Bid Bid No. Qty Unit Unit Amount CHANGE PHASING /ADDED CONCRETE COLLARS 0.00 0.00 0.00 0.00 CONCRETE COLLARS 14 EA 365.00 5,110.00 0.00 0.00 TOTAL NET CHANGE AMOUNT $ 5,110.00 0.00 0.00 0.00 0.00 TOTAL ADDED DAYS FOR CHANGE 3 CAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 North Texas Contracting, Inc. Job Name: COPPELL ROAD 9/17/2008 Location: COPPELL, TX 10:19 AM Bid Date: 6-Mar-08 Bid Time: 2:00 PM Revised 10/02 Item Description Bid Bid No. Qty Unit Unit Amount CUT 8~ PLUG EX. 8" WATER LINE n nn n nn CUT & PLUG EX. 8" WATER LINE 6 EA TOTAL CHANGE AMOUNT $ 5,550.00 TOTAL ADDED DAYS FOR CHANGE 5 CAL 0.00 0.00 925.00 5,550.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 O.On 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00