ST9905-MP071228
ID Task Name 1 BETHEL RD -PHASE I 2 SUBGRADE PREP 3 LIME STABILIZATION 4 CONCRETE PAVING 5 INTERSECTIONS 6 ASPHALT TRANSITIONS 7 STAMPED CONCRETE 8 INLET TOPS 9 DRIVEWAYS 10 SIDEWALK & RAMPS 11 BACKFILL 12 13 BASS PRO DR -PHASE I 14 SUBGRADE PREPARATION 15 LIME STABLIZATION 16 CONCRETE PAVING 17 INLET TOPS 18 DRIVEWAYS 19 SIDEWALK 8 RAMPS 20 BACKFILL 22 ENCHANTED WAY 23 CONCRETE REMOVAL 24 EXCAVATION 25 WIRE WALL /FILL 26 LIME STABILIZATION 27 CONCRETE PAVING 28 BACKFILL PHASE II TRAFFIC SWITCH 4 days Fri 12/28/07 14 days Wed 1/2/08 30 days Fri 1/18108 10 days Fri 2/22/08 3 days Fri 2/22/08 5 days Fri 2/22/08 5 days Fri 2/22/08 5 days Wed 3/5/08 5 days Tue 3/11/08 3 days Mon 3/17/08 70 days Wed 1/2/08 3 days Wed 1/2/08 5 days Fri 1/18/08 10 days Fri 2/22/08 2 days Thu 2/28/08 2 days Tue 3/11/08 ~ 3 days Mon 3/17/08 3 days Thu 3/20/08 , 61 days Mon 1/14/08 2 days Mon 1/14/08 ,f j_. 3 days Wed 1/16/08 3 days Wed 1/16/08 7 days Sat 1/19!08 10 days Mon 1/28/08 7 days Fri 2/8/08 1 day Mon 3124/08 '08 Apr 6, '08 T M F 32 BETHEL RD PHASE II 115 days Tue 3/25/08 Task ~-~ Milestone • External Tasks Project: Schedule 12-28-07 Split Summa External Milestone Date: Fri 12/28/07 ~~~~~~~~ ~~~~~~~ ry Progress Project Summary ~ Deadline Page 1 ID Task Name Duration Start 2, '07 Jan 13, '08 .Feb 24, '08 Apr 6, '08 May 18, '08 Jun 29, 'OS Aug F T S W S T M F T S W S T M 33 EXCAVATION 20 days Tue 3/25/08 34 SUBGRADE PREPARATION 5 days Thu 4/17/08 35 LIME STABILIZATION 20 days Wed 4/23/08 j 36 CONCRETE PAVING 30 days Fri 5/16/08 ~ 37 INTERSECTIONS 10 days Fri B/20/08 38 ASPHALT TRANSITIONS 3 days Fri 6!20/08 39 STAMPED CONCRETE 5 days Wed 7/2/08 40 INLET TOPS 8 days Fri 6120/08 41 DRIVEWAYS 10 days Fri 6/20/08 42 SIDEWALK & RAMPS 5 days Wed 712/08 43 BACKFILL 5 days Tue 7/8/08 44 PAVEMENT MARKINGS 5 days Mon 7/14/08 45 SIGNALS 20 days Mon 7/14/08 46 I ~ 47 BA33 PRO DR -PHASE 11 116 days Tue 3/25/08 48 EXCAVATION 10 days Thu 4/17/08 i ~~ i ~ ~~, ! ~ I ~ ~ i 49 EMBANKMENT 5 days Tue 4/29/08 50 DRILLED SHAFTS 5 days Tue 3/25/08 51 ABUTMENTS 10 days Mon 3131/08 52 CONCRETE RIPRAP 5 days Fri 4/11/08 53 SET BEAMS 1 day Thu 4/17/08 54 BRIDGE DECK 45 days Fri 4/18/08 55 RAILING 8 days Tue 6/10/08 56 SUBGRADE PREPARATION 3 days Wed 4/23/08 57 LIME STABILIZATION 8 days Fri 5/16/08 58 APPROACH SLABS 6 days Mon 5/26/08 59 CONCRETE PAVING 10 days Fri 6/20/08 60 INLET TOPS 5 days Mon 6/30/08 61 DRIVEWAY 5 days Wed 7/2/08 62 BACKFILL 5 days Mon 7/14/08 63 STRIPING & SIGNAGE 5 days Sat 7/19/08 64 SWITCH TRAFFIC 1 day Wed 8/6/08 Task ~~ Milestone • External Tasks Project: Schedule 12-28-07 Split Summary External Milestone Date: F ri 12!28/07 , , , , , , , , , , Progress Project Summary Deadline Page 2