Loading...
SS9402B-CS 960306 P.O. Box 478 Col=pall, Texas 75019 The City With A Beautiful Future 214-462-0022 P.O. Box 478 Coppell. Texas 75019 March 6, 1996 Douglas Bisballe, Vice President Pate Brothers Construction, Inc. 780 West Mansfield Highway Kennedale, Texas 76060 Re: Grapevine IV Sanitary Sewer SS 94-02B Change Order g2 Dear Mr. Bisballe: Attached to this letter is a Change Order which eliminntes the construction of the 12 inch sewer line from approximately Station 24+37 to approximately Station 20+09. Thi~ is a distance of 428 feet. As we were investigating the most appropriate way to imtall the sewer line down Bethel School Road across the existing box culvert, additionnl investi~ttion revealed that the line was a 12" line, not an 8" line as the consulting engineer has shown on the construction plans. When that was discovered, I instructed the Utility Department to televise the line to determine the condition. That line was televised on February 27th, 1996 and it was determined that the existing line was in adequate condition to be left in place. The Change Order lists seven bids items which will be affected and the amount by which they will be affected. I chose not to place any reduction in the contract on the change order until such time as we have had an opportunity to negotiate per the terms of the contract. As you are aware, the contract states that if any one bid item is 5 % of the total bid and then that particular bid item is being adjusted by 20% either up or down, then either party can negotiate on that particular bid item. In looking at the seven Bid Items, I determined that Bid Itetns//11 (12" SS [10'-15' deep]); //12 (12" SS [15'-20' deep]); //19 (4' manhole); and #32 (R&R 8" concrete) were all at least 5 % of the total bid and all had been adjusted by at least 20%. Bid Items 29, 36 & 38 will be adjusted according to the price bid on those items. It is our goal to expedite this Change Order as soon as possible, therefore, the City stands ready to meet with you to discuss the actual deduction on those particular bid items per the terms of the contract. I apologize for any inconvenience or confusion that this Change Order may have caused you. Please contact this office as soon as possible so that this item can be resolved. If you should have any questions please feel free to contact me at your convenience. Sincerely, KennL~eth M. Griffin, P.E. Assistant City Manager/City Engineer CHANGE OR EXTRA WORK ORDER * NOTE: See Attached Letter PROJECT: Grapevine IV Sanitary Sewer SS94-02B CONTRACTOR: Pate Brothers Construction, Inc. OWNER: City of Coppell CHANGE ORDER NO.: 2 DATE: March 6, 1996 CHANGE OR EXTRA WORK TO BE DONE Item Description Quantity Unit Unit Total # Priee DELETE: 11 12" SS (10'-15') 337.1 LF 31.52 12 12" SS (15'-20') 117.6 LF 40.80 19 4' Manhole 2 EA 2,597.01 29 Aband. SS MH 3 EA 763.43 32 R&R 8" Conc. 204 LF 59.33 36 R&R Rip Rap 9 SY 53.70 38 Trench Safety 395.7 LF 11.49 Total Revision to Contract Amount Previous contract amount $ Net increase in contract amount $ Revised contract amount S Net increase in contract time of completion N/A Revised Contract time of completion N/A The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of nil past and future liability originating under any clause in the Contract by reason of this revision to the Contract. Recommended by the City Engineer: Date: Agreed to by the Contractor: Date: Accepted by the Owner: Date: