SS9402B-CS 960119 January 190 1996 City of Coppell 255 Parkway Coppell, Texas 75019 RE: Grapevine IV Sanitary Sewer ATTN: Mike Mar~in ~~ ~ ~entlemen: ~ ~~ · In regards to the changed conditions in several locations on~ the project named above, the additional prices are listed below. Due to the conditions and inability to access the areas to be bored and/or tunneled, the contractor we selected to complete this work has given us an additional cost. Because of the difficulty of boring downhill, we propose to tunnel the bores. There are extra costs to remove the guard rail to gain access and to truck the excavated material (there is not a place to store the materials as originally planned). Also, we now have to have traffic control to use one (1) lane of Denton Tap Road as working space. Boring the trees west of Denton Tap, we are faced with the same problems of anCCessibility and nowhere to stock pile the excess dirt material~_~ he bore in Bethel School will require additional traffic control' d specialized barricading due to the construction in the street._.~ These changes in construction methods also prevail for Pate Brothers Construction during installation of the open cut sewer along with extra trucking of material in the street areas as well as the confined~arters along Denton Tap Road. Open Cut Add,ons Trucking/8 Days · $ 350.00 per Day Traffi~Control.- 8 Days · $ 175.00 per Day Loss/Sf Production - 8 Days · $ 3,803.00 per Day ~e~Sve Barricades ~ $ 600.00 LS Boring Additions Item %27 plus an additional $ 356.70 per LF Traffic Control - 20 Days $ 175.00 per Day Trucking - 6 Days $ 350.00 per Day Extra Barricading - 4 Days $ 350.00 per Day 0]./22/96 09:48 '~'817 483 0899 PATt; BROTHERS ~003/003 Extra Items Without Any Totals To Be Used As Needed Sidewalk Replacement $ 12.81 per LF Hydro Mulch & Seed $ 2,100.00 per Acre Sprinkler System Repair $ 1,500.00 per Site Shrub & Tree Replacement $ 3,500.00 Concrete Replacement Per Bid Item Please send a confirmation of these items so that we can proceed with the construct/on by January 29, 1996. If you have any questions, please contact me. Sincerely, P~~B.OTHE. S CONSTRUCTION, INC. DougZas Bisballe Vice President