Loading...
WA9402-CS 960410 DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING tying April 10, 1996 Mr. Kenneth Griffin, P. E. Assistant City Manager/City Engineer City of Coppell 255 Parkway Blvd. P. O. Box 478 Coppell, Texas 75819 RE: Section 2A & C and Section 3B - Dallas Water Supply Line (City of Irving) Dear Mr. Griffin: This correspondence is a follow-up to our conversation this morning conceming the Dallas Water Supply Line. The water line through the area associated with Coppell was awarded in two sections (Section 2A & C and Section 3B). Please refer to the attached construction plans. The contractors for these two projects, Section 2A & C and Section 3B, are Pate Brothers and J. C. Evans Construction Co., Steve Cervas respectively. As discussed this morning, the construction plans are complete. The projects have been awarded and pre-zonstruction meetings have been conducted for the projects. I apologize for not inviting a representative of the City of Coppell to be in attendance at the pre-constmction conferences. Presently, the pipe is almost completely manufactured by Gifford-Hill American. The contracts should be signed by all parties by the middle of next week and notices to begin construction should be issued, hopefully, for April 22, 1996. The projects will be coordinated in the field and inspected by Mr. Tim Bilyeu. He will be the contact person. He has been instructed to contact Mr. Lan~ Davis of your office. Mr. Bilyeu's supervisor is Mr. Rod Smithey, Chief Construction Inspector. He can be reached at 721-2222. We understand that we will be inspecting the projects. However, we also understand that your personnel will also be inspecting the projects in regard to City of Coppell infrastructure and specifications. If your representatives have any problems, please advise Mr. Bilyeu and he will address your concerns with the contractors. Additional concerns can be discussed with either Mr. Smithey or me. Thank you for your spirit of cooperation in this construction effort. If you have any additional questions, please advise. cm pc: Bob Chapman, Deputy Public Works Director Rod Smithey, Engineering Inspections Supervisor File "Assuring Public Welfare Thru Engineering Excellence" P.O. Box 1529.88 · 75015-9~288 825 West Irving Blvd. · Irving, Texas 75060 · (214) 721-2611 I~[:CYCLED