The punch list items listed below is a partial list due to incompletion
of paving and drainage along MacArthur Blvd. Additional punch list items
will follow related to drainage and utility construction.
MacArthur North Walk Thru Notes:
- Grade to drain, 3 to 1 slopes max., at Deforest Road
(behind power pole).
- Rout & seal asphalt to concrete.
- Seal all saw cut's in curbs & headers.
- Seal all utility block outs.
- Replace sidewalk at south east corner of MacArthur &
Deforest.
- Patch spall in pre-existing pavement at header north
bound.
North Bound Notes:
- Seal all redwood headers at bridge(s).
- Remove plastic from turn lane joint, north of bridge,
north bound.
- Seal redwood header in turn lanes north of bridge and
saw joints in median opening.
- Clean last curb inlet north bound.
- On northern most bridge clean up construction trash,
under bridge (barrels, barricades, R.C.P. etc.).
Page 2(MacArthur Blvd. (North) Walk-Thru
South Bound Notes:
- Put invert Station No. 223 + 90 in curb inlet.
- Clean pier cap's & bearing pad's on new bridges.
- Finish concrete rip rap between bridges up slope.
- Clean up, under bridge & down stream, construction
trash.
- Grout gaps in sand stone facia under bridges, both
slides.
- Clean up walkway on south end of new bridges.
- First drop inlet, south of bridge, clean out & seal all
curb inlet joints.
- Second drop inlet, south bound, remove form board &
bring up to grade.
- Curb inlet 216 + 60 clean out, north bound.
- Last 3 drop inlets, south end of project, clean out.
- Type X inlets not inspectable at this time.
NOTE:
Sidewalk needs extension to SW corner of MacArthur
& Deforest.
- Erosion control protection needed on banks E & W of
bridges. It appears some fill has already been pushed
in.
- Storm sewer system inspection punch list will follow
within twenty-four hours.
If you have any questions, please contact Larry Davis, Construction
Inspector, at 393-1016.
CLD/bd
CC:
Jeff Hawkins, M.U.D. Pierce, Lunsford Associates
Phil Deaton, Carter & Burgess
MACARTttUR BLVD. NORTH
Punch List
by Carter & Burgess
4-17-91
o
o
9
10
11
12
13
14
15
16
17
18
209 + 07 68' Lt - X inlets incomplete needs backfilling &
top poured.
209 + 10
sht. P-7.
209 + 37
poured.
209 + 7
209 + 87
poured.
210 +
Nose of median needs concrete poured to 7.5' width.
131' Rt. - X inlet incomplete needs backfilling & tops
Also, ditch line needs
131' Rt. - Water meter cover needs backfilling & building
55' Rt. - Inlet incomplete, needs backfilled & top
208 + 85 - 214 +
- Nose of median needs concrete poured to 7.5' width
- 4' Sidewalk to be poured.
209 + 50 - 75' Lt. Pipe to be removed.
212 + 46 - Inlet needs forms removed and lid installed.
216 + 60 - Inlet needs backfilling.
217 + 50 - Nose of median needs concrete.
217 + 90 Rt. - Driveway needs to be sawed & sealed.
216 + 61 70' Lt. - Inlet top needs to be poured.
217 + 90 90' Lt. - Inlet top needs to be poured.
215 + 75' Rt. - Inlet top needs to be poured.
219 + Driveway joint needs to be sealed
218 + 40 - Nose of medians needs concrete.
221 + - Railing needs installation on bridge.
Outside beams needs concrete
Rip-rap between abutments 1-2 & 3-4 needs to be instale
Storm Sewer outfall north abutment needs to be
chipped and grouted
Decking forms needs to be stripped from north
bound lane at abutment #4
General cleanup around bridge
18. Cont'd - Permanent benchmarks to be installed 2 places
on bridge structure (S-6 #9)
Horizontal and vertical ties for con duit
ends in bridge area (S-6 #8)
19.224 + 20 - Nose of median needs concrete pavement.
20. 223 + 70 - 120' Rt. Cement joint needs to be removed.
21. 225 + 20 - Nose of median needs cement pavement.
22. 221 + 10 - 20' Rt. Crack in pavement needs to be routed
and sealed.
23. 227 + 15 - Debris needs to be removed from the south side of
existing bridge
Ground
24. Traffic buttons need to be installed at left turn lanes.,
25. Roadway needs to be sweeped clean of debris - nails, branches,
dirt - etc.