Loading...
ST8601-CS 910416DATE .- TO: F ROM .' RE: COPPELLPUBLIC WORKS April 16, 1991 Larry Davis, Construction Inspector Rey Gonzales, Streets Superintendent~ MacArthur Blvd. (North) Walk - Thru MacArthur North Walk Thru Notes: - Grade to drain, 3 to 1 slopes max., at Deforest Road (behind power pole). - Rout & seal asphalt to concrete. - Seal all saw cut's in curbs & headers. - Seal all utility block outs. - Replace sidewalk at south east corner of MacArthur & Deforest. - Patch spall in pre-existing pavement at header north bound. North Bound Notes: - Seal all redwood headers at bridge(s). - Remove plastic from turn lane joint, north of bridge, north bound. - Seal redwood header in turn lanes north of bridge and saw joints in median opening. - Clean last curb inlet north bound. - On northern most bridge clean up construction trash, under bridge (barrels, barricades, R.C.P. etc.). Page 2. South Bound Notes: - Put invert Station No. 223+90 in curb inlet. - Clean pier cap's & bearing pad's on new bridges. - Finish concrete rip rap between bridges up slope. - Clean up, under bridge & down stream, construction trash. - Grout gaps in sand stone facia under bridges, both sides. - Clean up walkway on south end of new bridges. - First drop inlet, south of bridge, clean out & seal all curb inlet joints. - Second drop inlet, south bound, remove form board & bring up to grade. - Curb inlet 216 + 60 clean out, north bound. - Last 3 drop inlets, south end of project, clean out. - Type X inlets not inspectable at this time. NOTE: Sidewalk needs extension to SW corner of MacArthur & Deforest. - Erosion control protection needed on banks E & W of bridges. It appears some fill has already been pushed in. - Storm sewer system inspection punchlist will follow within twenty-four hours. If you have any questions, please contact me. RG/dg MACNORTH.RG