Loading...
Duke Lesley-CS061117(12/21/2009) Ken Griffin -Early Grading Permit Page 1 From: "Alex Bennett" <Alex. Ben nett @dukerealty.com> To: "Keith Marvin (E- mail)" <kmarvin @ci.coppell.tx.us> CC: "Ken Griffin (E- mail)" <kgriffin @ci.coppell.tx.us >, "Jack Evans (E- mail)... Date: 11/17/2006 3:05 PM Subject: Early Grading Permit Attachments: Early Grading Permit. PDF Keith, Please find attached the permit application, copy of the contract amount and fee letter. Jack will forward the necessary plan sets first thing Monday morning. Thanks- Alex Bennett, P.E. Development Services Manager Duke Realty Corporation 5495 Belt Line Road Suite 360 Dallas, TX 75254 p. 972 - 361 -6714 f. 972 - 361 -6800 <<Early Grading Permit. PDF» T H E G t T Y 0 F EARLY GRADING / EXCAVATION PERMIT IN RIGHT -OF-WAY 1 EASEMENT f/PRIVAATE PROPERTY Date: — Grading plans provided and approved. (Erosion Control must be installed prior to beginning work) Tree Removal Permit required. Hold Harmless Letter from the Property Own . f p rty erlL'ngrneerrl�eveloper is attached. Prod ect Name /Location. -- N General Contractor: D v V- -e Permit issued to Company /Representative: NALtc aq Address: _ c A1� �mwe (zo , �Ui� 2 � D�i1.AS I�C �7S2S Telephone #: _ �1'L• 7 0foV. 01'� Emergency Telephone #: °I?Z.36I. �7w �ffi� General Description of work (provide copy of approved plans): S -ONV Was contact made With City and/or Utility Companies to locate existing utilities? if NO, Reason: YES 0 NO � Was contact made With Leisure Services Dept, concerning Tree Removal Permit? if NO, Reason: Is removal of existing street, alleys, or sidewalks necessary? if YES, Attach Bore/Street Cut /Saw Cut Permit Is Floodplain Permit required? if YES, Permit # or date of City Council variance YES Q NO Q YES NO Q YES NO Early Grading /Excavation Permit Page 2 Representative (s) of the Contractor must adhere to all construction standards approved PP d by the City of Coppell, which includes but is not limited to: Erosion Control ordinance compaction Ordinance, o�ttpact�on requirements (density tests will be required at the applicant's expense) Free Ordina ' P l ce and barricading according to the Texas Manual on Uniform T'ra c Control Devices. ,�,� Area(s) affected must be restored to as good condition as before the commencement .� o work (grading, drainage, vegetation, and erosion control). ➢ Any work requiring closing of a lane of traffic, street or alley ust y be approved by the Engineering Dept. with notification to the following prior to closing g Police Department c@ 972 - 304 - 3600 Fire Department @ 972 -304 -3500 Street Department @ 972- 304 -3546 Engineering Department 0 972. 304 - 3679 Attach barricade plan 1 trench safety plan of a lane or street closure is required. Note: street closures are allo wed rom 9:00 a.m. until 4:00 p.m. ONLY unless otherwise approved b City Engineer. A 2 inspection fee for grading is required rior to beginning work. p g g (attach copy of excavation contract for verification) Amount Due: -- A 7j? Date Paid: A I ►1 I bb �:• City inspector must be notified 24 hours rior to beginning work p g g related to this permit. //t 10 ��� b� Signature of Applicant /Contractor Rep, Printed Name Date Signature of City Representative Printed Name City Inspector for this project Date Contact Number(s) Applicant shall indemnify and forever hold harmless against the City o Co el . g ty ,f C el each an every claim, demand or cause of action that may be made or come ag ainst it b reason o or g y f if any way arising out of the closure, blocking, excavating, cutting, or other g gf g, work by the applicant under permit from the City, if such permit is g ranted. T.J. Lambrecht construction, Inc. (VTJLAC ) Subcontract No. LEZ301 -000-05 ARTICLE 4 PAYMENTS 4.1 Subcontract Sum Duke shall pay the Subcontractor for the performance of the Work the total sum of: $1,016,582.00. - The Subcontract Sum has been determined as follows: 02 -15 -002 Mobilization $30,000.00 02- 15-002 Clearing /Grubbing $16,962.00 02-15 -002 Strip Topsoil $90,758.00 02 -15 -002 Mass Earthwork $738,647 02 -15 -002 Fine Grading/Replace Topsoil $134,016.00 02 -15 -002 Construction Entrance $6,189.00 OVERALL CONTRACT TOTAL: $1,016 4.2 Progress Payments Based upon Applications for Payment submitted to Duke by the 25th day of the month, Duke shall make progress payments to the Subcontractor within ten (10) days of Duke's receipt of payment from the owner. Applications for Payment received after the 25th day of the month shall not be processed until the 25th day of the next month. 4.3 �Retainage Duke shall retain from each progress payment a sum equal to ten percent (10 %) of the progress payment authorized by Duke for payment to the Subcontractor. Retainage Will not be released prior to thirty (30) days following final completion of the Work. 4.4 Final „Payment Final Payment, constituting the entire unpaid and earned balance of the Subcontract Sum, shall be paid to the Subcontractor as provided in the Subcontract General Conditions. 7 FORM SC -1 (Texas) (Rev.2124106) IAO Duke W CONSTRUCTION November 17, 2006 Keith Marvin, P.E. Assistant City Engineer City of Coppell 255 Parkway Blvd Coppell, TX 75019 Re: Point west Early Grading Permit Fees Dear Keith: Per our discussions, the City of Coppell will waive the payment of the permit fee at this time. In return, Duke Construction agrees to reduce the overall reimbursement to be received as part of the Developer's Agreement by the associated 2% permit fee totaling $20,331.64. If you have any questions or require further information, please do not hesitate to contact me at 972 - 361 -6714. Sincerely, DUDE CONSTRUCTION L.P. /44 - r - 4 Alex Bennett, P.E. Development Services Manager cc File 5495 Belt Line Road Atlanta Dallas Raleigh Suite 360 Chicago Indianapolis St. Louis Dallas, TX 75254 Cincinnati Minneapolis South Florida 972.361.6700 Cleveland Nashville Tampa www.dukerealty.com Columbus Orlando