Loading...
Duke Lesley-CS070220 Page 1 of 2 Ken Griffin - RE: Utility Permit From:"Alex Bennett" <Alex.Bennett@dukerealty.com>     To:"Ken Griffin" <kgriffin@ci.coppell.tx.us>     Date:2/20/2007 5:26 PM     Subject:RE: Utility Permit     CC:"Jack Evans (E-mail)" <jevans@pkce.com>       Ken-   Thanks a lot for your quick review.  I'll give Larry a call to set up the pre-con.   Thanks again Alex -----Original Message----- From: Ken Griffin [mailto:kgriffin@ci.coppell.tx.us] Sent: Tuesday, February 20, 2007 5:18 PM To: Alex Bennett Cc: Paula Crocker Subject: Re: Utility Permit Alex   I did a review letter today.  The plans generally look good, however I still have a question about the 'n' value used for the partially concrete lined channels and if they have adequate capacity.   This does not affect the utility information, so you could go ahead and schedule your pre-con as long if everything else is taken care of, ie, fees, inspection fees, any permitting (not counting the state, but that does need to be addressed soon so water can be discharged), etc.   Ken Griffin  >>> "Alex Bennett" <Alex.Bennett@dukerealty.com> 2/20/2007 5:00 PM >>> Ken- Just wanted to touch base with you and see how the final review of the plans was progressing.  We are about to wrap up the dirt work and our utility contractor is chomping at the bit to get started.  The sooner we can schedule a precon with Larry the better. Thanks for all the help- Alex Bennett, P.E. Development Services Manager Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 p. 972.361.6714 f. 972.361.6800 file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\45DB2F2DCity...12/21/2009 Page 2 of 2 file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\45DB2F2DCity...12/21/2009