Loading...
Duke Lesley-CS070306 (2)Page 1 of 3 Ken Griffin - Fwd: Fw: Drainage Channel Issues From: Ken Griffin To: Jack Evans Date: 3/6/2007 4:11 PM Subject: Fwd: Fw: Drainage Channel Issues Attachments: Drainage Channel March 2007 . j pg; Drainage Channel 1 March 2007 . j pg; Drainage Channel 2 March 2007 . j pg; Drainage Channel 3 March 2007 . j pg; Drainage Channel 4 March 2007 . j pg Jack Could you check this out? There appears to be two issues. One, if the silt did come from the Duke site then it needs to be removed. Two, if silt is leaving the site then the erosion control is not working correctly and it should be revised to ensure silt does not leave the Duke site. Let me know when you determine what's going on so I can respond to the property owner. Thanks Ken >>> Engineer 3/6/2007 3:28 PM >>> »> Nikki Yaklin <nikki.yaklin @rree£com> 3/6/2007 2:47 PM »> Hello, I sent the message below to Keith Marvin. I just received a response that he is no longer in the engineering department. Could you please have someone contact me regarding this issue. Thank you. Sincerely, Nikki Yaklin Property Manager 972.323.8417 (direct line) 972.323.8401 (fax) - - - -- Forwarded by Nikki Yaklin/PM /RREEF on 03/06/2007 02:42 PM - - - -- Nikki Yaklin/PM /RREEF 03/06/2007 02:39 file: HC: \Documents and Settings \radloo \Local Settings \Temp \XPgrpwise \45ED92BACity... 12/21/2009 Page 2 of 3 PM To KMARVIN @CI.COPPELL.TX.US cc Jimmy Bright/PM /RREEF @DBAmericas, Craig Snow /PM /RREEF @DBAmericas, Anthony James /PM /RREEF Subj ect Drainage Channel Issues Hello Keith! Last year you came out and met myself and my Operations Manager at our property located at 1405, 1421, 1441 & 1461 S. Beltline Rd. At the time we were having an issue with soil erosion from the adjacent properties clogging up the drainage channel that runs though the middle of our business park. Last year we incurred over $15,000 to get the excess silt and dirt removed from the drainage channel. With the development of the new DUKE commercial site to our West and South erosion control has not been added to prevent soil erosion, thus the ditch we cleaned out last year is approximately 50% full of silt from their site. Please let me know when the erosion control will be added along our Western boundary and who will be responsible for cleaning this ditch again. I have attached photos for your review. (See attached file: Drainage Channel March 2007.jpg)(See attached file: Drainage Channel 1 March 2007.jpg)(See attached file: Drainage Channel March 2007.jpg)(See attached file: Drainage Channel 3 March 2007.jpg)(See attached file: Drainage Channel March 2007.jpg) file: HC: \Documents and Settings \radloo \Local Settings \Temp \XPgrpwise \45ED92BACity... 12/21/2009 Page 3 of 3 Best Regards, Nikki Yaklin Property Manager 972.323.8417 (direct line) 972.323.8401 (fax) This e -mail may contain confidential and /or privileged information. If you are not the intended recipient (or have received this e -mail in error) please notify the sender immediately and destroy this e -mail. Any unauthorized copying, disclosure or distribution of the material in this e -mail is strictly forbidden. file: HC: \Documents and Settings \radloo \Local Settings \Temp \XPgrpwise \45ED92BACity... 12/21/2009