Loading...
Duke Lesley-CS080130 (12/22/2009) Ken Griffin - Lesley UpdatePage 1 From: "Alex Bennett" <Alex.Bennett@dukerealty.com> To: "Keith Marvin (E-mail)" <kmarvin@ci.coppell.tx.us>, "Ken Griffin (E-mail... CC: "Keith Flowers" <keith.flowers@dukeconstructiononline.com> Date: 1/30/2008 11:20 AM Subject: Lesley Update Below is an update on the few outstanding issues: TxDOT frontage road - after review from the regional transportation group - TxDOT has once again changed their mind and want to revert back to the original design of Point West intersecting the frontage road/ramp at a T - therefore we will not have to realign/demo the road as currently constructed. Traffic signal - battery backup - I have a call into Naztec to determine why it was not included, Andy Watson, the sales mgr handling this project is on vacation until Monday. I'll provide an update as soon as I am able to touch base with him. Thanks- Alex Bennett, P.E. Development Services Manager Duke Realty Corporation 14241 N Dallas Pkwy, Suite 1000 Dallas, Texas 75254 p. 972.361.6714 f. 972.361.6800