Duke Lesley-CS080215
(12/22/2009) Ken Griffin - Lesley Infrastructure Final AcceptancePage 1
From:
"Alex Bennett" <Alex.Bennett@dukerealty.com>
To:
"Ken Griffin (E-mail)" <kgriffin@ci.coppell.tx.us>
CC:
"Keith Marvin (E-mail)" <kmarvin@ci.coppell.tx.us>, "Larry Davis (E-mail...
Date:
2/15/2008 8:05 PM
Subject:
Lesley Infrastructure Final Acceptance
Attachments:
Coppell Final Acceptance Letter.PDF; Coppell Retainage Reimbursement Letter
.PDF
Gentlemen/lady-
Please see attached. Hard copies to follow via FedEx.
Thanks-
Alex Bennett, P.E.
Development Services Manager
Duke Realty Corporation
14241 N Dallas Pkwy, Suite 1000
Dallas, Texas 75254
p. 972.361.6714
f. 972.361.6800
<<Coppell Final Acceptance Letter.PDF>> <<Coppell Retainage Reimbursement Letter.PDF>>
,
Duke
CONSTRUCTION
February 15,2008
Ken Griffin, P.E.
Director of Engineering & Public Works
City of Coppell
255 Parkway Blvd
Coppell, TX 75019
Re: City of CoppeU Final Acceptance - Point West Infrastructure
Dear Ken:
This letter is to serve as a formal request for final acceptance of the aforementioned project with the following
conditions.
1) Mylar copies of revised civil record drawings per comments by Larry Davis emailed to Jack Evans
and myself on Thursday, Feb. 12,2008 (complete on/about Feb 22)
2) Installation of ILNS signs on the Belt Line RoadlDividend Road traffic signal (complete on/about
Feb29)
3) Installation of Clary battery backup on the Belt Line RoadlDividend Road traffic signal (complete
on/about March 14)
4) Affidavit of payment from Durable Specialties (complete on/about March 14)
As the issues listed above are minor in scope with relation to the overall project, we request a final acceptance of
the overall Lesley Infrastructure project with the conditions and accompanied time lines listed above.
Additionally, I have attached the formal request for the remaining funds spelled out in the Developer's
Agreement to be distributed.
If you have any questions or require further information, please do not hesitate to contact me at 972-361-6714.
Sincerely,
DUKE CONSTRUCTION L.P.
/ftI ~G ').
Alex Bennett, P.E.
Development Services Manager
cc: Keith Marvin- Engineering, City of Coppell
Larry Davis- Engineering, City of Coppell
Mindi Hurley- Economic Development Coordinator, City of Coppell
Jack Evans- Pacheco Koch Consulting Engineers
File
Enc.
14241 N. Dallas Parkway
Suite 1000
Dallas, TX 75254
972.361.6700
www.dukerealty.com
Atlanta
Baltimore
Chicago
Cincinnati
Cleveland
Columbus
Dallas
Houston
Indianapol is
Minneapolis
Nashville
Orlando
Phoenix Tampa
Raleigh Washington DC
St. Louis
South Florida
,
Duke
CONSTRUCTION
February 15,2008
Ken Griffin, P .E.
Director of Engineering & Public Works
City of Coppell
255 Parkway Blvd
Coppell, TX 75019
Re: Point West Ilf/rastrudun Reinll1ruwment Request
Dear Ken:
This letter is to serve as a request for payment for the final reimbursement per the Developer's Agreement dated July 10,
2007.
SlJI.o~""..,j ~"'
Watfr StfuDra:t Annn
Sanitlly Se\I\e' Suboootract Armmt
4% P\tJIic Utility Jmpection Fee
w~SewerSu'**l
$1.~6.oo
$313.639.00
$S6.00J.OO
$J.466,m(iO
$l,S1lO,OOO 111m. CJty R!tmbunemeat
Stoon Se\\a" Suboootract Annn
Pa~ Suboootract Anno
4% Nllic Utility Inspectim Fee
llal6-..tlCCureSubaal
$921,391.00
$1,268,298.00
$87,587.56
$1+TT;rt6.!6
$l,S1lO,OOO IIIIX. Oty ........~
fa"""" s...nn-.,
Utility Gln
~Gln
Thaffic Signal Gln
Utility Inspectioo Fees
~ JnspectiooFees
Mass F.artlt\\Uk Impectim Fees
ToI11l RIimIII....,.",
Less nmies received
Total 01 f' .....
$1,456,223.00
$1,500,00.00
$200.00.00
($S6.00J.OO)
($87,587.56)
($20,331.64)
$2.991.295.MJ
-$2,693,066.22
$299,229.!8
If you have any questions or require further information, please do not hesitale to contact me at 972-361-6714.
Sincerely,
DUKE CONSTRUCTION L.P.
Alox1!!.PJi ~
Development Services Manager
cc: Keilh Marvin, Engineering, City of Coppell
Mindi Hw1ey, Economic Development Coordinator, City of Coppell
File
14241 N. Dallas Parkway
Suite 1000
Dallas, TX 75254
972.361.6700
www.dukerealty.com
Atlanta
Baltimore
Chicago
Cincinnati
Cleveland
Columbus
Dallas
Houston
Indianapolis
Minneapolis
Nashvi lie
Orlando
Phoenix Tampa
Raleigh Washington DC
St. louis
South Florida